A scheme optimization and virtual simulation technology, which is applied in the field of oil and gas well drilling, can solve problems such as difficulties, inability to achieve simultaneous optimization, and inability to design data-driven, etc., to achieve the best effect of risk control and drilling efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] Below in conjunction with accompanying drawing, the present invention is described in further detail:
[0029] The present invention designs a drilling scheme optimization method based on virtual simulation, uses the risk level and ROP of each well section calculated in the simulation system to calculate the comprehensive risk coefficient and drilling time coefficient of the whole well, and finally calculates The optimization coefficient S of each drilling design scheme n , S n The smallest one will be automatically selected as the optimal solution.
[0030] The steps of the inventive method are as figure 1 shown, including:
[0031] Step 0: Assuming that the optimal plan needs to be selected from N sets of plans, first obtain the ROP data of the entire well section and the drilling risk level data of the entire well section for each plan; including section-by-section from the wellhead to the bottom ROP and the corresponding well section length; the drilling risk le...