Method for determining construction tunneling parameters of shield tunnel undercrossing water channels
A technology of excavation parameters and shield tunneling, applied in the direction of electrical digital data processing, special data processing applications, instruments, etc., can solve problems such as inaccurate positioning, errors, and reduced accuracy of simulation results, with good results and remarkable optimization effects , The effect of saving labor and time costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] The invention provides a method for determining construction and excavation parameters of a shield tunnel passing through a waterway, which includes the following operation steps;
[0043] Step S1: Select a test section with the same geological conditions below the target waterway (such as a certain section of waterway, including but not limited to the Maliuzhou Waterway) according to the hydrogeological conditions in the construction section of the entire line, and conduct construction site simulation;
[0044] Step S2: When simulating the construction site of the test section, arrange the monitoring surface and monitoring points, collect and sort out the information of various construction parameters in the simulated construction, so as to determine the preliminary tunneling parameter values during the period when the shield machine passes through the target waterway;
[0045] Step S3: Using spss software, the construction parameter information is divided into two ca...
Embodiment 2
[0062] Embodiment 2 of the present invention provides a method for determining construction and excavation parameters of a shield tunnel passing through a waterway (it is the same as the operation method of Embodiment 1, and it is only an embodiment applied to the Maliuzhou Waterway);
[0063] Embodiment 2 of the present invention takes the shield tunneling machine passing through the Maliuzhou waterway as an example, and introduces a method for determining the construction and excavation parameters of the shield tunnel under the waterway, which includes the following steps (see figure 1 , In addition, there are more operating procedures, please refer to figure 2 ):
[0064] Step S1: In the construction section of the whole line, according to the hydrogeological conditions, select a test section with the same geological conditions below the target waterway (Maliuzhou Waterway) to conduct construction site simulation;
[0065] Step S2: When simulating the construction site of...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com