Claim expense early warning method and system
A cost and treatment cost technology, applied in the field of insurance services, can solve the problems of infringing on the interests of the insured, and even the public interest, lack of scientific identification methods for medical insurance fraud, affecting the balance of medical insurance funds, etc., so as to reduce the cost of claims management and control and improve the The effect of efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0100] Outpatient dispensing of membranous nephropathy, 6 kinds of single prescription drugs, cost nearly 15,000. Among them, tacomos capsules (immunosuppressants) are equipped with 15 boxes, which cost more than 10,000 yuan.
[0101] If the traditional manual review is used, no claim refusal is found, and the claim will be paid normally.
[0102] If the cost early warning model of the present invention is adopted, the model kidney disease early warning value is 2,050 yuan, and the cost far exceeds the early warning value, and there is abuse. Therefore, the early warning can be prompted or the compensation can be refused.
example 2
[0104] The client went to the doctor for upper respiratory tract infection, and the drug cost was 4,475 yuan, and the list was not provided.
[0105] If the traditional manual review is used, no claim refusal is found, and the claim will be paid normally.
[0106] If the cost early warning model of the present invention is adopted, the early warning value of upper respiratory tract infection is 1278 yuan, which is obviously higher than the early warning value, and there is abuse. Therefore, early warning can be prompted or compensation can be refused.
[0107] 3. Claims Expense Early Warning System
[0108] According to an embodiment of the present invention, a claim settlement cost early warning system is also provided, which is used to execute each step of the method described in the embodiment of the present invention.
[0109] Figure 5 It is a schematic diagram of functional modules of the claim settlement cost early warning system according to an embodiment of the pr...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com