A construction method of a cable-stayed bridge
A construction method and technology for cable-stayed bridges, which can be applied to cable-stayed bridges, bridges, bridge parts, etc., can solve the problems of heavy bridge body weight, high design height, and many materials, so as to save materials and reduce building height. , the effect of reducing the weight of the structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0052] Such as Figure 1-3 , Figure 10-12 , Figure 16-18 Shown, a kind of cable-stayed bridge of the present invention adopts the structural arrangement of single tower double cable plane, mainly comprises auxiliary pier 1 and bridge end 5, and cable-stayed bridge auxiliary pier 1 and bridge end 5 are used as supporting cable-stayed bridge auxiliary pier fulcrum, supports The entire Leaning Tower Bridge. In order to improve the stiffness of the main span, the auxiliary pier 1 is arranged inside the side span. The auxiliary pier 1 is made of reinforced concrete to ensure the stability of the pier structure; because the force of the auxiliary pier 1 is relatively complicated, especially when the active load Under the action, the auxiliary pier 1 may bear a relatively large vertical uplifting force, but cannot bear the horizontal force, so the present invention provides a tensile support on the structural setting of the auxiliary pier 1 . The bridge end 5 is used as the main...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 