Method for regulating and controlling hardness of alloy structural steel 50CrVA
A technology of alloy structural steel and hardness, which is applied in the field of adjusting and controlling the hardness of alloy structural steel 50CrVA, which can solve the problems of high processing difficulty and low overall material utilization rate, and achieve the effects of improving utilization rate, eliminating annealing treatment process, and reducing use cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] The concrete composition of the 50CrVA steel that present embodiment provides is as follows:
[0043] C: 0.49, Si: 0.26, Mn: 0.7, P: 0.015, S: 0.003, Cr: 1.00, Ni: 0.04, Cu: 0.09, V: 0.152.
[0044] The phase transition points measured by DIL805L static phase transition instrument are: Ac1: 766°C, Ac3: 786°C, Ar1: 648°C, Ar3: 680°C.
[0045] In the above-mentioned embodiment, the above-mentioned material is firstly heated by a heating furnace, and then rolled by a step-by-step 26-stand continuous rolling mill.
[0046] Specifically, the above materials are used to make three round steel billets of the same specification, which are respectively rolled and tested on the upper cooling bed. At the same position of the three billets, water cooling before final rolling and water cooling before entering the cooling bed are carried out respectively. The final test results are as follows:
[0047] Specifications / mm
Embodiment 2
[0049] C: 0.5, Si: 0.29, Mn: 0.74, P: 0.015, S: 0.004, Cr: 1.02, Ni: 0.05, Cu: 0.12, V: 0.144.
[0050] The phase transition points measured by DIL805L static phase transition instrument are: Ac1: 770°C, Ac3: 789°C, Ar1: 652°C, Ar3: 683°C.
[0051] In the above-mentioned embodiment, the above-mentioned material is firstly heated by a heating furnace, and then rolled by a step-by-step 26-stand continuous rolling mill.
[0052] Specifically, the above materials are used to make three round steel billets of the same specification, which are respectively rolled and tested on the upper cooling bed. At the same position of the three billets, water cooling before final rolling and water cooling before entering the cooling bed are carried out respectively. The final test results are as follows:
[0053] Specifications / mm
P3 / ℃
P4 / ℃
P5 / ℃
P6 / ℃
Hardness / HBW
50
827
794
880
683
310
50
847
814
900
718
268
50
876
...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
