A method and system for uplink framing of ONU end in xgspon
A framing and row grouping technology, which is applied in the field of ONU upstream framing in XGSPON, can solve the problems of increased ONU power consumption, unfavorable promotion and popularization of XGSPON equipment, expensive ONU equipment, etc., and achieve the effect of reducing scale
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0073] see figure 1 As shown, the embodiment of the present invention provides a method for ONU end upstream framing in XGSPON, comprising the following steps:
[0074] S1, allocate TCONT data cache according to the number of TCONT, respectively store the uplink data frame data corresponding to each TCONT; allocate TCONT description cache according to the number of TCONT, store the frame description of the uplink data frame corresponding to each TCONT;
[0075] S2, when receiving the uplink data frame and the TCONT number, write the uplink data frame data into the TCONT data cache corresponding to the TCONT number, and write the uplink data frame frame length and the gemport information of the data frame into the TCONT description cache corresponding to the TCONT number;
[0076] S3, when receiving the TCONT upstream bandwidth allocated to the ONU by the OLT and the involved TCONT number, obtain the XGEM framing intermediate information corresponding to the TCONT number, read ...
Embodiment 2
[0091] see figure 2 As shown, on the basis of Embodiment 1, step S3 specifically includes the following steps:
[0092] S301. When receiving the TCONT upstream bandwidth allocated to the ONU by the OLT and the involved TCONT number, read the XGEM framing intermediate information of the TCONT, and jump to S302;
[0093] S302, judging whether the remaining length of the data frame of the XGEM framing intermediate information is 0, if not, then go to S303; if so, go to S307;
[0094] S303. Determine the payload length of the XGEM frame according to the smaller value of the remaining length of the data frame and the remaining bandwidth of TCONT, and turn to S304;
[0095] S304, judging whether the remaining length of the read data of the XGEM framing intermediate information is 0, if not, then go to S305; if so, go to S310;
[0096] S305, judging whether the remaining length of the read data of the XGEM framing intermediate information is greater than or equal to the payload le...
Embodiment 3
[0108] On the basis of Embodiment 1, the working principle of a method for upstream framing at the ONU end in XGSPON is as follows:
[0109] When the TCONT XGEM framing circuit receives the TCONT upstream bandwidth allocation issued by the OLT, the trigger process starts, assigning the TCONT upstream bandwidth allocation value to the TCONT upstream remaining bandwidth, and reading the XGEM framing intermediate information of the TCONT at the same time.
[0110] Judging whether the remaining length of the data frame of the TCONT XGEM framing intermediate information is equal to 0, if it is equal to 0, check whether there is data in the TCONT data frame description buffer, if there is no data, send XGEM idle frame framing. If there is data in the TCONT data frame description cache, read a data frame description, and get the payload length of the XGEM frame according to the smaller value of the data frame length in the data frame description and the length of the TCONT upstream ba...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com