A method for fast emergency calculation of maximum pollutant load exceeding standard in river of small watershed
A calculation method and maximum load technology, applied in the direction of calculation, special data processing applications, instruments, etc., to achieve the effect of realizing river water environmental protection and preventing river pollution from exceeding the standard
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] Taking a river in a small watershed in the north as an example, combined with the attached Figure 1 to Figure 6 The specific implementation of the present invention will be described in detail with specific circumstances.
[0024] Such as figure 1 As shown, in the specific implementation of the present invention, a fast emergency calculation method for exceeding the maximum load of pollutants in a river in a small watershed specifically includes the following steps:
[0025] (1) Draw the flow time curve:
[0026] Arrange the daily average flow values of the outlet sections of small watershed rivers for four consecutive years in order from large to small, calculate the percentage exceeding the corresponding daily average flow, take the percentage exceeding the corresponding daily average flow as the abscissa, and the corresponding flow as the vertical Coordinates, draw the flow time curve, such as figure 2 shown;
[0027] (2) Draw the load duration curve:
[002...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com