Unlock instant, AI-driven research and patent intelligence for your innovation.

Method for laying power supply cable of ship shore power system for water level drop

A technology for power supply cables and water level drop, which is applied to cable laying equipment, the arrangement of reels and photosensitive drums, etc., which can solve the problems of overhead cables, frequent friction of steel wire strands, and inconvenient installation and maintenance.

Active Publication Date: 2019-01-15
GEZHOUBA GRP ELECTRIC POWER COMPANY
View PDF8 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The cables are overhead, and overhead support needs to be built, which is costly;
[0004] Cables are overhead, installation and maintenance are inconvenient, and there are potential safety hazards in high-altitude operations;
[0005] When the cable is retracted and retracted in the fluctuation of water level, it will frequently rub against the steel wire strands, and the frequency of cable folding is too high, which will affect the service life;
[0006] The overhead cables are located in the wind direction area with water, and the wind force is erratic, which requires high stability of the overall transmission structure. In the case of sudden strong winds, it is difficult to control the retraction and release between the barge, the cable and the steel strand, and it is easy to cause the barge to capsize ,There are security risks

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for laying power supply cable of ship shore power system for water level drop
  • Method for laying power supply cable of ship shore power system for water level drop
  • Method for laying power supply cable of ship shore power system for water level drop

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] like Figure 1~Figure 4 Among them, a method for laying power supply cables suitable for water level drop ship shore power system, the method includes the following steps:

[0029] Step 1: Installation of cable winch 1;

[0030] Step 2: Installation of cable tray 2;

[0031] Step 3: cable 3 laying;

[0032] Step 4: Install the cable net 4;

[0033] Step 5: Install the tension sensor 5.

[0034] In step 1, the cable winch 1 is hoisted on the prefabricated support platform 11, and the cable release end 12 faces the barge 6; the mounting hole of the base of the cable winch 1 corresponds to the positioning hole on the support platform 11, and is connected and fixed by fasteners;

[0035] The control device 13 is located at the lower part of the support platform 11 ; the control circuit of the cable winch 1 is connected to the control device 13 ; the output end of the tension sensor 5 is connected to the control device 13 .

[0036] The detailed steps are:

[0037] Ste...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

A Method for laying power supply cable of ship shore power system for water level drop is provided. The cable bridge is arranged along the inclined bank, the cable net jacket is arranged through the cable connected with one end of the barge power receiving equipment and connected with the tension sensor, and the barge is connected through the tension sensor. When the barge changes with the water level, the control equipment controls to start the cable winch to shrink or release the cable. The cable bridge is arranged along the inclined bank, and the cable net jacket is connected with the tension sensor. The Method for laying power supply cable of ship shore power system for water level drop overcomes the problems of high cable laying cost, low cable life and potential safety hazard of theoriginal ship shore power system. The method has the advantages of low construction cost, no need of high-altitude operation, precise control of cable shrinkage and release amount, long service life,safety and reliability.

Description

technical field [0001] The invention belongs to the technical field of ship shore power, and relates to a method for laying a power supply cable suitable for a ship shore power system with water level drop. Background technique [0002] At present, docks along rivers, lakes or islands are usually provided with platforms for ships to dock for supplies, float in the water, and berth on the shore, also known as barges. It is a rectangular flat-bottomed boat without a power device, and its power source is provided by the power supply system on the shore. At present, most of the power supply cables of the shore power system are laid in a wave shape along with the overhead steel strands; The water level fluctuates and the winch automatically retracts and unwinds the steel strand. The problems of laying the shore power system cable by this method are: [0003] The cables are overhead, and overhead support needs to be built, which is costly; [0004] Cables are overhead, install...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02G1/06H02G11/02
CPCH02G1/06H02G11/02
Inventor 杨植民潘露童青李少华张弦
Owner GEZHOUBA GRP ELECTRIC POWER COMPANY