Unlock instant, AI-driven research and patent intelligence for your innovation.

A construction method of a steel structure truss hanging structure

A construction method and technology of steel structure, applied in the direction of load hanging components, transportation and packaging, can solve the problems of inability to carry, the steel column is particularly large, affecting the structural safety, etc. The effect of butt installation

Active Publication Date: 2019-12-20
BEIJING CONSTR ENG GRP CO LTD +1
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, in the process of steel structure construction, the stress generated by the application of structural constant load on the main stressed members is common. When the truss is lifted and installed, a large axial force F will be generated on the lower chord of the truss during the application of structural constant load. , the axial force of the lower chord of the truss is transmitted to the steel tube concrete column, which will cause a particularly large bending moment on the steel column. Under the action of the earthquake force, the steel column will not be able to bear this bending moment, which will affect the structural safety.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A construction method of a steel structure truss hanging structure
  • A construction method of a steel structure truss hanging structure
  • A construction method of a steel structure truss hanging structure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0043] A construction method of a steel structure truss 1 hanging structure disclosed by the present invention comprises the following construction steps:

[0044] A. Processing and trial assembly of truss: refer to figure 1 and figure 2 , in order to meet the on-site hoisting conditions and facilitate hoisting, the steel structure truss 1 of the present invention is divided into three sections for processing, which are two end truss sections 14 and the middle main truss section 15 respectively. The end truss section 14 includes an upper chord 11 , a lower chord 12 and at least two webs 13 , which may be two webs 13 . One end of the upper chord 11 of the end truss section 14 is welded to the steel column 2, and the other end is welded to the upper chord 11 of the main truss section 15; one end of the lower chord 12 of the end truss section 14 is connected to the corbel 21 of the steel column 2 , the other end is welded to the lower chord 12 of the main truss section 15. C...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a construction method for a downwards-hung structure of a steel structure truss. The construction method comprises the following construction steps: S1, truss hoisting, namelylifting a truss to a mounting position, then, welding and fixing an upper chord and a steel column, and abutting a lower chord with a corbel; S2, stress release deformation joint arrangement, namelyarranging a node position on a part where the lower chord of the truss is abutted with the corbel of the steel column, and disconnecting a part where the lower chord is abutted with the corbel to makethe truss form an upwards-hung truss; S3, constant load application, namely mounting a secondary beam after finishing the mounting and welding of the truss, then, mounting a steel bar truss floor bearing plate, and finally, carrying out concrete pouring construction; and S4, node welding, namely welding the lower chord of a main truss section with the corbel of the steel column. Due to the arrangement of a disconnecting node, an axial force for applying a constant load to the lower chord of the truss can be effectively released, a bending moment of the axial force of the lower chord of the truss to the steel column can be eliminated, and the construction method has the effects of optimizing the structural design, improving the stress capacity of the node and enhancing the shock resistance.

Description

technical field [0001] The invention relates to the technical field of steel structure engineering, in particular to a construction method of a steel structure truss hanging structure. Background technique [0002] At present, in the construction technology of steel structures, there are many studies on the treatment of welding stress, but there are few studies on the treatment of stress concentration at the nodes generated by structural dead load during the installation of steel structures. The traditional welding stress aging treatment methods are natural aging and thermal aging. There is also a vibration aging: the vibration aging is derived from the knock aging. Through special equipment, the workpiece is resonated at the natural frequency, so that the periodic dynamic stress and residual stress are superimposed, and the workpiece is partially plastically deformed to release the stress. Thereby reducing and homogenizing the residual stress inside the workpiece, so that...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): B66C13/08B66C13/00
CPCB66C13/00B66C13/08
Inventor 祁晓强杜洪涛潘天华王斌张旸宋宁王凯段旭辉
Owner BEIJING CONSTR ENG GRP CO LTD