Duplex reporting system
A link and performance technology, applied in the field of work management software, can solve the problems of inability to collect dates, unable to realize the function of work planning, no separation of work planning links and work execution links, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] 1. Data structure
[0021] The following describes the format of the data structure: field name, field type and field description.
[0022] 1.1 User table
[0023] slightly
[0024] 1.2 Transaction template table
[0025] Transaction Template ID Integer*
[0026] Transaction template name String
[0027] 1.3 Process template table
[0028] Process Template ID Integer*
[0029] Transaction Template ID Integer Corresponding to 1.1 Transaction Template Table. Transaction Template ID
[0030] Process template name String
[0031] progress number integer
[0032] Label for planning and execution Character type Single option: planning; execution; handover
[0033] Link label Character type Single option: the first link of the plan; the middle link of the plan; the last link of the plan;
[0034] Execute the first link; execute the middle link; execute the tail link
[0035] Pairing label Shaping The pairing identification of the planning link and the execution link...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


