Building formwork for fire climbing ladder and its construction method
A technology of building formwork and formwork, applied in molds, manufacturing tools, mold fixtures, etc., can solve the problems of low pouring efficiency, achieve high efficiency and improve efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] Embodiment 1: a kind of building formwork for fire climbing ladder, as figure 2 , including four support columns 3, a top plate 4 fixed above the support column 3, a fixed column 6 fixed below the top plate 4 and passing through the formwork unit 5, at least two formwork units 5, each formwork unit 5 comprising a U-shaped frame 52 , the fixing plate 51 , the connecting bolt 53 , the connecting bolt 53 passes through the fixing plate 51 and connects with the U-shaped frame 52 . The distance between two adjacent support columns 3 is greater than the corresponding length or width of the template unit 5 , so that the U-shaped frame 52 and the fixing plate 51 can slide out from between the two support columns 3 .
[0025] Such as Figure 3-4 A first horizontal bar 511 is fixed on the fixing plate 51, a second horizontal bar 521 is fixed on the inner wall of the U-shaped frame 52, and one end of the first horizontal bar 511 and the second horizontal bar 521 abuts and at th...
Embodiment 2
[0028] Embodiment 2: A construction method for a fire-fighting ladder: a construction method for a fire-fighting ladder, comprising the following steps: 1) pouring the base 2, pouring the bottom of the steel bar main body in the base 2, and pouring the bottoms of the four supporting columns 3 at the same time In the base 2, and a top plate 4 is welded on the top of the support column 3; 2) Put the bottom formwork unit 5, the bottom of the bottom formwork unit 5 is horizontal (the formwork unit 5 consists of a U-shaped frame 52 and a fixed plate 51 , connecting bolts 53, first connecting block 514, and second connecting block 524), pour concrete to the bottom of the first groove 513, put it into the upper formwork unit 5, and the first formwork unit 5 of the upper formwork unit 5 A horizontal bar 511 and a second horizontal bar 521 squeeze the concrete in the lower formwork unit 5, then pour the concrete to the bottom of the first groove 513 close to the formwork unit 5, and put...