A method for calculating an optimal explosive quantity and arranging an optimal charge structure
A calculation method and technology of explosive quantity, applied in the field of rock blasting, can solve problems such as not a clear calculation value
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0159] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
[0160] There are 31 foundation pits to be blasted in a blasting project. The size and shape of foundation pits 1# to 30# are elliptical with a major axis of 12 to 16 meters and a minor axis of 10 to 14 meters; the blasting area is about 10 meters away from the nearest residential house; Quartzite, amphibolite, limestone and shale; the rock formations are horizontal and gently inclined; pits 8# to 11# adopt the conventional blasting method with a diameter of 115mm, and the remaining foundation pits adopt the main-auxiliary blasting method with a diameter of 40mm and a diameter of 90mm , charge struc...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


