Reverse seepage pressure treatment method for face-face dams on narrow valleys in rainy areas
A treatment method and technology of face dams, applied in barrages, dams, weirs, etc., can solve problems such as difficulty in ensuring the quality of drainage pipe plugging, difficult to observe, and hidden dangers in the safe operation of the anti-seepage system
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings. This embodiment is implemented on the premise of the technical solution of the present invention, and detailed implementation methods and specific operating procedures are provided, but the scope of protection of the present invention is not limited to the following Described embodiment.
[0028] The reverse osmotic pressure treatment method of the face dam construction period on the narrow valley in the rainy area of the present invention is to combine the drainage and osmometer embedding requirements during the construction period on the bedrock 2 surface downstream of the toe plate 1 of the face rockfill dam. , excavate a drainage channel with a certain flow capacity along the cross-section of the bedrock 2 and backfill it with drainage material 3, such as figure 1 As shown; during the construction period, it is used as a discharge channel for c...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com