The construction method of the pipe curtain section
A construction method and pipe curtain technology, which are used in earth-moving drilling, shaft equipment, wellbore lining, etc., can solve problems such as the impact of structural strength, and achieve the effect of avoiding ground collapse and ensuring construction strength.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and examples.
[0020] Such as figure 1 and figure 2 As shown, the embodiment of the present invention provides a construction method for the pipe curtain segment. The construction method of the pipe curtain section includes dividing the pipe curtain structure into the first layer and the second layer along the vertical direction, and the second layer is located above the first layer; cutting, supporting and pouring the steel pipes of the first layer , after the pouring is completed, check the structural strength of the first layer; when the structural strength of the first layer meets the requirements, cut, support and pour the steel pipes of the second layer; when the structural strength of the first laye...
PUM
Login to View More Abstract
Description
Claims
Application Information