Method for follow-up long steel casing construction of pile foundation construction in karst area
A technology of steel casing and pile foundation, which is applied in basic structure engineering, sheet pile wall, building and other directions, can solve the problems of low construction accuracy and affect the construction of pile foundation, etc., and achieve convenient and rapid construction, firm and stable hole wall , to ensure the effect of construction accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment
[0027] The embodiment of the present invention provides a method for following up the construction of long steel casings in pile foundation construction in karst areas, including the following specific steps:
[0028] S1. First determine the position of the pile core point according to the pile foundation design plan, and fix the pile at the pile core position. After the pile core position is determined, build four guard piles around the pile core, and each Bind a positioning line, and make the intersection point of the two positioning lines coincide with the position of the pile center point;
[0029] S2. After the positions of the pile core and the guard pile are determined, use concrete to fix the pile foundation at the position of the pile core and the guard pile, and disassemble the two positioning lines;
[0030] S3. After the concrete at the position of the pile core and the guard pile is solidified, the drilling rig can be dispatched in place. According to the design p...