Construction method of high-altitude conjoined steel truss

A construction method and the technology of conjoined steel, applied in the processing of building materials, construction, building structure, etc., can solve the problems of difficult control of safety hazards, long construction period, troublesome construction and dismantling of scaffolding, etc., to ensure construction strength and improve Construction efficiency and the effect of shortening the construction period

Inactive Publication Date: 2015-12-30
中国建筑第五工程局有限公司广州分公司 +1
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Although this construction method using scaffolding to assist in the construction of high-altitude conjoined steel trusses can ensure construction safety, the process of erecting and dismantling the scaffolding is cumbersome, which makes the construction period of the entire corridor longer, and the main span of the building on both sides And when the height is large, the overall strength of the scaffold is relatively low, the safety hazard is serious and the cost is high
Therefore, the tonnage of construction equipment on the carrying platform is limited, and some large equipment needs to be placed in other ways
The installation method of overall lifting and overall sliding is to install the building components in place through large-tonnage or long-stroke jacking equipment after the pre-assembly on the ground is completed. This method is mainly limited by the construction height and requires a lifting channel The space is regular, there is no collision and passability, and the cost is high, and the safety hazard is difficult to control

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0020] Below, in conjunction with specific embodiment, the present invention is described further:

[0021] The construction method of high-altitude conjoined steel truss of the present invention comprises the following steps:

[0022] A. Pre-embed supporting parts on the opposite surfaces of the main body of the building on both sides, and the height of the supporting parts is located below the position of the pre-built steel truss;

[0023] B. Build a steel-frame protective platform on the podium roof between the main building bodies on both sides, and set support beams at both ends of the steel-frame protective platform; the strength of the protective platform must be able to meet the requirements of construction equipment and manual operation. The length is equal to the building distance between the building bodies on both sides;

[0024] C. Use a tower crane to hoist the steel frame protection platform to the height of the support, and connect and fix the support beams a...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

A construction method of a high-altitude one-piece steel truss comprises the following steps of (A) embedding supporting parts; (B) erecting a steel frame protective platform; (C) hoisting the steel frame protective platform and wielding the steel frame protective platform with the supporting parts; (D) erecting the steel frame protective platform to be a movable platform; (E) hoisting a bottom girder; (F) splicing a load-bearing bailey frame on the bottom girder in a sectioned mode, fixing the end of the spliced bailey frame on steel structures of building bodies on two sides to form a bailey frame operation platform; (G) erecting other steel members of the steel truss on the bailey frame operation platform; (H) cutting the supporting parts and hoisting the steel frame protective platform to the ground after finishing the whole steel truss construction. The steel frame protective platform is installed by adopting a direct hoisting mode, accordingly the safe platform for devices and workers to move is formed at the construction position, and the construction method is simple and can improve the construction efficiency and shorten a construction period. In addition, the bailey frame operation platform is adopted for bearing load, and the construction strength can be ensured.

Description

technical field [0001] The invention relates to the field of building technology, in particular to a construction method of a high-altitude conjoined steel truss. Background technique [0002] In recent years, there have been many high-altitude conjoined buildings. During the construction of these buildings, the main structure of the two sides of the building is usually constructed first, and then a corridor is built between the tops of the main buildings on both sides. [0003] At present, the construction process of high-altitude corridors is usually carried out by using the traditional method of building a floor-standing support system or the overall lifting and sliding. Specifically, starting from the ground, scaffolding is overlapped between the main bodies of the buildings on both sides, and the scaffolding is built to the connection. At the predetermined position of the corridor, a bearing platform for placing equipment and standing on the scaffold is formed on the sc...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04G21/14
Inventor 陈晓峰张志杰刘传杰肖胜亮郭元伟聂泽泉
Owner 中国建筑第五工程局有限公司广州分公司