Unlock instant, AI-driven research and patent intelligence for your innovation.

The construction method of underground excavation tunnel closely sticking to the bottom plate of the existing structure

A technology with existing structures and construction methods, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve problems such as potential safety hazards

Active Publication Date: 2020-11-24
中建八局轨道交通建设有限公司
View PDF10 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to overcome the defects of the prior art, to provide a construction method for underground excavation tunnels to closely adhere to the bottom of the existing structure, and to solve the problem that the existing advanced measures cannot avoid the settlement of the bottom of the existing structure and there are certain potential safety hazards The problem

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • The construction method of underground excavation tunnel closely sticking to the bottom plate of the existing structure
  • The construction method of underground excavation tunnel closely sticking to the bottom plate of the existing structure
  • The construction method of underground excavation tunnel closely sticking to the bottom plate of the existing structure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0034] refer to figure 1 , The present invention provides a construction method for a submerged tunnel to closely adhere to the bottom of an existing structure, which is used to control the settlement and deformation of the bottom of the existing structure and ensure construction safety. In the construction method of the present invention, the support is used to support between the initial support structure and the existing structural bottom, and supports the existing structural bottom, and the support is used to support the existing structural bottom, which can control the settlement of the existing structural bottom. In addition, the construction method of the present invention is provided with a grouting bag at the bottom of the existing structural floor, and a grouting pipe is reserved for grouting into the grouting bag through the grouting...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a construction method for enabling an existing structural baseplate to pass through a subsurface tunnel downwards in a close lamination mode. The method comprises the following steps: digging an upper guide hole of the tunnel, and reserving a soil layer with a certain thickness between the top of the formed upper guide hole and the corresponding existing structural baseplate; installing a primary branch structure on the inner wall of the formed upper guide hole; excavating the reserved soil layer to form a gap; supplying a support part, enabling the support part to beplaced in the gap and support the existing structural baseplate, and then enabling the support part and the top of the primary branch structure to be fixedly connected; and spraying concrete towards the inner wall of the formed upper guide hole so as to form an anchoring primary branch structure and the primary branch concrete structure of the support part. According to the construction method, the support part supported below the existing structural baseplate is adopted, the support part and the primary branch structure are fixedly connected, the support part, which is additionally arranged,is utilized to support the existing structural baseplate to control the falling of the existing structural baseplate, and the support part is anchored in the primary branch concrete structure, therebyreinforcing the support strength of the support part.

Description

technical field [0001] The invention relates to the field of tunnel construction engineering, in particular to a construction method for a submerged tunnel to closely adhere to the bottom plate of an existing structure. Background technique [0002] At present, the demand for subways in various cities in China, the intersection, parallel, connection, and co-construction of new rail lines and existing rail lines are increasing. It is inevitable that some subway stations or sections are close to or even close to existing lines. Construction, because some subway lines in operation have been constructed for a long time, limited by the materials and construction techniques at that time, and the structural safety of some lines has reached a critical state. Therefore, on the premise of ensuring the safe and normal operation of the existing subway lines, how to safely carry out become a construction problem. In the prior art, the full name of the CRD construction method, the full n...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D9/00E21D11/00E21D11/10
Inventor 杜劢姚文杰孙中鹤彭嵚邵庆硕
Owner 中建八局轨道交通建设有限公司