The construction method of underground excavation tunnel closely sticking to the bottom plate of the existing structure
A technology with existing structures and construction methods, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve problems such as potential safety hazards
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0033] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0034] refer to figure 1 , The present invention provides a construction method for a submerged tunnel to closely adhere to the bottom of an existing structure, which is used to control the settlement and deformation of the bottom of the existing structure and ensure construction safety. In the construction method of the present invention, the support is used to support between the initial support structure and the existing structural bottom, and supports the existing structural bottom, and the support is used to support the existing structural bottom, which can control the settlement of the existing structural bottom. In addition, the construction method of the present invention is provided with a grouting bag at the bottom of the existing structural floor, and a grouting pipe is reserved for grouting into the grouting bag through the grouting...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


