A project progress monitoring system based on BIM

A technology for monitoring systems and progress, applied in the fields of instruments, data processing applications, metadata still image retrieval, etc., can solve problems such as disadvantage and lack of on-site intuitive feeling.

Pending Publication Date: 2019-06-18
深圳市国晨工程造价咨询有限公司
View PDF4 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In terms of progress management of existing projects, due to its model-based characteristics, BIM technology lacks an intuitive experience on site, which is not conducive to project supervision to know in a timely manner whether each construction part is proceeding according to plan, and there is still room for improvement

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A project progress monitoring system based on BIM
  • A project progress monitoring system based on BIM

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0038] The present invention will be described in further detail below in conjunction with the accompanying drawings.

[0039] refer to figure 1 , a BIM-based engineering progress monitoring system disclosed in this embodiment includes a control terminal 1, and the BIM-based engineering progress monitoring system also includes a construction completion time database 2 that stores construction parts and the corresponding construction completion time 3. The construction part 3D visualization model database storing the construction part and the corresponding 3D visualization model when the construction is completed. 3. The 3D panoramic data acquisition device for collecting the 3D panoramic data of the construction part in the construction site. 4. Stored with The real-time three-dimensional panorama database 5 of the construction part and the real-time three-dimensional panorama data collected and generated by the three-dimensional panorama data acquisition device 4 for the cons...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a project progress supervision system based on BIM. The invention relates to the field of building information model. The problem that a project supervisor cannot timely knowwhether each construction part is carried out according to a plan or not is solved; The system comprises a control terminal, Construction completion time database, The system comprises a constructionpart, a construction part three-dimensional visualization model database, a three-dimensional panorama data acquisition device, a construction part real-time three-dimensional panorama database, a conversion device for converting three-dimensional panorama data into a three-dimensional visualization model, a supervisor mobile phone database in which the construction part and a corresponding supervisor mobile phone number are stored, and a short message prompting device. The method has the advantage that engineering supervision can conveniently know each construction part which is not completedaccording to the plan and the corresponding delay time.

Description

technical field [0001] The invention relates to a field based on building information models, in particular to a BIM-based project progress monitoring system. Background technique [0002] The Chinese translation of BIM is building information model. BIM technology is a digital tool applied to engineering design and construction management. It integrates relevant information of various projects through parameter models, so that this digital information model is used as the basis of each construction project. Do all related work. [0003] With the development of the domestic architectural design field, BIM has been initially applied to the construction industry and demonstrated its huge commercial value, but there are still great limitations in the current application status of BIM. Although BIM is shared and transmitted during the life cycle of project planning, operation and maintenance, it enables engineering and technical personnel to correctly understand and efficiently...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06Q10/06G06Q50/08G06F16/2455G06F16/58G06F16/538
Inventor 常建位宇宙刁杰幸张塨王静珂
Owner 深圳市国晨工程造价咨询有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products