A kind of roof construction method of water-proof roof drop bucket on broken bridge

A construction method and the technology of the drain bucket, which is applied to the roof, roof covering, roof drainage, etc., can solve the problem of shortening the service life of the building, not taking into account, not taking into account the closed combination of the flat coil and the fan-shaped coil of the drain, etc. problem, achieve the effect of slowing down the speed of leakage, increasing the stroke, and avoiding water seepage on the roof

Active Publication Date: 2020-08-25
ZHEJIANG IND POLYTECHNIC COLLEGE
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, the roof leakage of construction projects is a common quality problem in national projects. There have been no good measures to solve it for many years, which shortens the service life of normal buildings. It did not take into account the closed combination of the flat coiled material and the fan-shaped coiled material of the drain, making it a weak link for waterproofing, nor did it take into account the influence of the thickness of the roof structure layer, leveling layer, slope layer, and insulation layer, resulting in the protection of the coiled material layer. There is only one simple caulking with the flange ring for waterproofing. The length of the downspout is not enough to cause hanging feet, and the drain pipe is directly connected to the outside. The temperature difference between the indoor and outdoor cold bridges will condense and produce condensed water. The root of the downspout absorbs water to form a false leak. Affect the use of functions

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A kind of roof construction method of water-proof roof drop bucket on broken bridge

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] Reference figure 1 The embodiment of the roof construction method of the broken bridge waterproof roof drooping bucket of the present invention will be further described.

[0023] A roof construction method for a broken bridge waterproof roof drooping bucket. A concrete layer 9 is laid on the roof. The thickness of the concrete is generally about 120mm. When laying the concrete layer 9, the water stop on the outer tube 13 of the drooping bucket 2 The ring 10 is pre-embedded in the concrete layer 9; it is poured into a whole with the concrete layer 9. After the strength of the concrete layer 9 is qualified, the first leveling layer 8 is laid on the concrete layer 9. Generally, the thickness of the first leveling layer 8 is 20mm Around, because the surface of the concrete layer 9 is bumpy, it is necessary to lay the first leveling layer 8 to make the surface smooth for subsequent construction. After the first leveling layer 8, a vapor barrier 7 of about 10mm and a thermal in...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a roof construction method of a broken bridge waterproof roof gutter spout funnel. The roof construction method includes the following steps that a water stop ring on an outerbarrel of the gutter spout funnel is pre-embedded in a concrete layer when a roof reinforced concrete floor slab is poured; a first leveling layer, a vapor barrier layer, a heat insulating layer, a slope making layer and a second leveling layer are laid successively on the concrete layer; a coiled material layer is laid on the second leveling layer, the tail end of the coiled material layer is putinto a water stop groove of the outer barrel, and then the water stop groove is filled with waterproof glue; a waterproof layer and a coiled material protective layer are laid successively on the coiled material layer; and the gutter spout funnel is inserted into the outer barrel pre-embedded in the concrete layer through an inner barrel. According to the roof construction method of the broken bridge waterproof roof gutter spout funnel, the waterproof effect is good.

Description

Technical field [0001] The invention relates to the field of roof waterproofing, and more particularly to a roof construction method of a broken bridge waterproof roof drooping bucket. Background technique [0002] At present, roof leakage in construction engineering is a common quality problem of national engineering. For many years, there have been no better measures to solve it, which shortens the service life of normal buildings. The existing 87 roof sink does not take into account the treatment of coiled materials. It does not consider the closed combination of flat coiled material and the fan-shaped coil of the downspout, making it a weak link in waterproofing, nor does it take into account the influence of the roof structure layer, leveling layer, slope finding layer, and insulation layer thickness, resulting in a coil protective layer There is only a simple caulking joint with the flange ring for waterproofing. The length of the falling bucket is not enough to cause the p...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04D13/08E04G21/00
CPCE04D13/08E04D2013/0826E04D2013/084E04D2013/086E04G21/00
Inventor 刘启顺刘相均杜素云贾汝达李少和周何铤江俊美马宝英
Owner ZHEJIANG IND POLYTECHNIC COLLEGE
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products