Soil ball fixing pile for forestry planting and application method thereof
An application method and a technology of fixing piles, which are applied in forestry, application, agriculture, etc., can solve the problems of complex structure and poor effect of soil ball fixing, and achieve the effects of simple structure, improved survival rate, and guaranteed vertical growth
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0047] See Figure 5 , In the process of use, first dig a hole for the location that needs to be transplanted, and then place the soil ball 6 of the seedlings in the hole. At this time, take four piles 1 and arrange the piles 1 evenly around the soil ball 6 , And then chisel the pile 1 into the pit with a hammer, so that the side wall of the pile 1 is in contact with the soil ball 6 after being chiseled in. At this time, the staff must first take the No. 1 rope body 8 and pass the No. 1 rope body 8 sequentially Pass the rope hole 2 on the pile body 1 so that the rope can go around the earth ball one round and be properly tightened, and then the rope is connected end to end and knotted to form a maintenance structure.
[0048] Then take two No. 2 rope bodies 9 and first pass one end of one No. 2 rope body 9 into the rope threading member of one of the piles 1, where the rope threading member is the first C-ring 31, and then The penetrating end of the second rope body 9 is passed a...
Embodiment 2
[0050] See Image 6 , In the process of use, first dig a hole for the location that needs to be transplanted, and then place the soil ball 6 of the seedlings in the hole. At this time, take five piles 1 and evenly arrange the piles 1 outside the soil ball 6 Then, the pile 1 is chiseled into the pit with a hammer, so that the sidewall of the pile 1 is in contact with the soil ball 6. At this time, the staff must first take the No. 1 rope body 8 and place the No. 1 rope body 8 in turn Pass through the rope hole 2 on the pile 1 so that the rope can go around the earth ball and be properly tightened, and then the rope is connected end to end and knotted to form a maintenance structure.
[0051] Then take a No. 2 rope body 9, first pass one end of the No. 2 rope body 9 through the second C-ring 32, which is the rope threading member of one of the piles 1, and then pass the No. 2 rope body 9 The entry end is separated by a pile 1 and penetrates into the corresponding second C-ring 32. ...