Earthwork excavation method for long and narrow deep foundation pit
A technology for earthwork excavation and deep foundation pits, which is applied in excavation, infrastructure engineering, construction, etc. It can solve the problems of underutilization, slow excavation, and limited excavation speed, so as to shorten the construction period, speed up the progress, and reduce pollution. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0046] The invention provides an excavation method for narrow and long deep foundation pits in the form of an underground diaphragm wall plus steel pipe internal support, comprising the following steps:
[0047] Such as figure 1 As shown, the horizontal direction is layered according to the horizontal spacing of steel pipe supports, and the horizontal direction is divided into ① layer soil and ② layer soil. ① The direct excavation of layer soil does not require vertical division.
[0048] figure 2 As shown, the vertical excavation of foundation pit earthwork is divided according to the vertical spacing of steel pipe supports (the design drawings will have the horizontal and vertical distribution design of steel supports, and the construction shall be carried out according to the horizontal and vertical spacing between steel supports required by the design drawings Layers, partitions), divided into multiple partitions in Zone A - Zone I. ② The soil body of the layer is divi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com