Smart load realization method and device
An implementation method and intelligent technology, applied in the direction of instrumentation, error detection/correction, calculation, etc., can solve problems such as unsuitable cluster software, achieve efficient testing, save time and cost, and improve testing efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0057] Such as figure 1 As shown, the present invention provides a method for realizing a smart load, comprising the following steps:
[0058] S1. Start the test, and the load management node automatically scans the idle load working nodes;
[0059] S2. The load management node automatically establishes a connection with the idle load working node;
[0060] S3. The load working node enters the busy state, and the load management node performs a performance test with the busy state load working node;
[0061] S4. The performance test ends, and the load management node is automatically disconnected from the busy load working node;
[0062] S5. End the test.
Embodiment 2
[0064] Such as figure 2 As shown, the present invention provides a method for realizing a smart load, comprising the following steps:
[0065] SA1. The load management node installs the management client, and the load work node installs the load client;
[0066] S1. Start the test, the load management node automatically scans all idle load working nodes in the local area network;
[0067] S2. The load management node automatically establishes a connection with the idle load working node; the specific steps are as follows:
[0068] S21. The load working node judges its own working state after receiving the command from the load management node to scan the idle state load working node;
[0069] S22. If it is in an idle state, the load working node sends a command to confirm the idle state to the load management node;
[0070] If it is busy, discard the message without processing it;
[0071] S23. After the load management node receives the confirmation idle state command se...
Embodiment 3
[0082] Such as image 3 As shown, the present invention provides a device for implementing a smart load, including:
[0083] The test start module 1 is used to start the test and configure the load management node to automatically scan the load working nodes in the idle state;
[0084] The connection establishment module 2 is used to configure the load management node to automatically establish a connection with the load working node in the idle state; the connection establishment module 2 includes:
[0085] The working state judging unit 2.1 is used to configure the load working node to judge its own working state after receiving the command of the load management node to scan the idle state load working node;
[0086] The idle state confirmation unit 2.2 is used to configure the load working node to send a confirmation idle state command to the load management node;
[0087] The connection request unit 2.3 is used to configure the load management node to send a connection ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



