A data processing method, surveying method and system for fault zone surveying
A data processing and fault zone technology, applied in the field of geological exploration, can solve the problems of inaccurate positioning and real-time monitoring of fault zones, and achieve the effect of improving the survey accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] Please refer to figure 1 , which is a flow chart of a method for surveying a fault zone in an embodiment, the present application discloses a method for surveying a fault zone, including:
[0035] Step 101, deploy monitoring points in the pre-survey area.
[0036] According to the monitoring accuracy requirements for monitoring fault zones in the pre-survey area, multiple monitoring points are set in the pre-survey area. like figure 2 As shown, it is a schematic diagram of setting monitoring points in the pre-survey area in an embodiment. The range delineated by the curve 202 is the pre-survey area, and the marking lines 203 and 204 are the length and width of the positioning accuracy P (in meters). Set multiple monitoring points 201 and 205 in the pre-survey area according to monitoring accuracy requirements. The density of monitoring points depends on the monitoring accuracy requirements for fault zone identification. The higher the accuracy requirements, the highe...
Embodiment 2
[0048] Please refer to Figure 11 , is a structural schematic diagram of a fault zone survey system according to an embodiment. The fault zone survey system includes a fault zone survey device 100 , a processor 200 and a fault zone drawing device 300 . A plurality of monitoring points are arranged in the pre-monitoring area, and each monitoring point is equipped with a fault zone survey device 100 for obtaining monitoring data of earthquake precursor signals at different times at the monitoring point in the pre-survey area and the time of the earthquake event occurring within the monitoring time . The processor 200 is configured to receive the monitoring data output by the fault zone surveying device and the time of the occurrence of the seismic event within the monitoring time period, and perform statistics on the monitoring data of the preset time period before the occurrence of the seismic event to obtain statistical data, and based on The statistical data draws a schemati...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com