Slope of railroad bed, railroad bed and construction method
A technology for railway subgrades and slopes, applied in infrastructure engineering, roads, excavation, etc., can solve the problems of slope occupation, high cost, and more land, and achieve the effects of reducing land occupation, greening land occupation, and reducing costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 example
[0045] Such as Figure 1-3 As shown, the embodiment of the present invention provides a railway embankment, the two sides of the railway embankment include side slopes and fillers between the two side slopes of the railway embankment. said figure 1 , figure 2 with image 3 Indicates the situation of different slope ratios, where image 3 It is a high and steep slope, and the slope ratio can reach 1:0.5.
[0046]Wherein, the slope includes geocells 11 , support columns 21 and toe walls 31 . The geocells 11 are stacked from bottom to top. The cell chamber of the geocell 11 is filled with roadbed filler 41 . The middles of the two geocells 11 adjacent up and down are filled with roadbed filler 41 of preset height. The upper end of the support column 21 is fixed on the bottom of the geocell 11 , and the lower end of the support column 21 is inserted into the subgrade filler 41 below the geocell 11 . The toe wall 31 is located under the side of the lowest geocell 11 . Spe...
no. 2 example
[0054] In order to better understand the railway embankment, the construction process of the railway embankment is introduced below, and the process includes the following steps:
[0055] Step 501: Build the toe wall 31 on the ground. Both sides of the roadbed are built, and the distance between two toe walls 31 is the width of the roadbed. Specifically, M10 mortar rubble is used for the toe wall. In this way, it is more solid. Before building the toe wall, the site conditions should be leveled to ensure that the subgrade site is flat and even. The leveling of the site and the construction of the foot wall are the same as the conventional method.
[0056] Step 502 : Fill the roadbed filler 41 between the two toe walls 31 . The roadbed filler 41 filled between the two toe walls 31 needs to be higher than the toe walls 31 by a certain height. In this way, the geocells 11 will not be laid too densely in the height direction, thereby reducing the cost.
[0057] Step 503 : st...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com