A partition wall in a tunnel with a middle disconnection
A technology for partition walls and tunnels, applied in mining equipment, earth-moving drilling, mining devices, etc., can solve the problems of easy falling off track, small distance, difficult fixing of flexible materials, etc., to achieve easy construction, good durability and reliability, Calculation model for clear effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] Below, the present invention is described in detail with reference to accompanying drawing and embodiment:
[0023] Such as Figure 1~2 As shown, a tunnel partition wall with a middle disconnection includes an upper half partition wall 1 lining the lower end of the vault and a lower half partition wall 2 at the upper end of the inverted arch. The upper half partition wall 1, The middle partition wall 2 in the lower half is opposite and a disconnection gap 3 is formed between the two, and both sides of the middle partition wall 1 in the upper half section and the middle partition wall 2 in the lower half section are provided with pre-arches for sealing the disconnection gap 3 Stainless steel plate 4.
[0024] Upper bolts 5 are pre-embedded in the lower part of the partition wall 1 in the upper half section, lower bolts 7 are pre-embedded in the upper part of the partition wall 2 in the lower half section, and the through holes in the pre-arched stainless steel plate 4 a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com