Auxiliary installer for construction plastic pipeline joint
A technology of plastic pipes and installers, applied in the field of construction pipeline installation, can solve the problems of easy damage due to operator errors, difficulty in ensuring accurate fusion depth, and difficulty in inserting and fusing heat sealers and pipes. The effect of damaged pipes
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0019] Such as Figure 1-3 As shown, an auxiliary installer for construction plastic pipe joints includes a mounting frame 1, a swing rod 2, an arc-shaped rod 4, a first elastic member 5, an arc-shaped rack 6, a runner 7, a gear ring 8, and a mobile The assembly 9, the heat sealer 10, the connecting rod 11, the clamping device 12, the clamping plate 13, the stopper 14 and the fourth elastic member 141, the mounting frame 1 is provided with a swing rod 2 in a rotating manner, and the lower side of the mounting frame 1 is open There is a first arc-shaped slot 3, an arc-shaped rod 4 is slidably arranged on the first arc-shaped slot 3, one end of the arc-shaped rod 4 is connected with the swing rod 2, and a first elasticity is provided between the mounting frame 1 and the swing rod 2. The first elastic member 5 is a compression spring, the arc-shaped rod 4 is provided with an arc-shaped rack 6, the mounting frame 1 is rotatably provided with a runner 7, and the runner 7 is provided...
Embodiment 2
[0024] Such as Figure 1-3 As shown, on the basis of Embodiment 1, it also includes a first guide sleeve 15, an arc-shaped top rod 16, a guide wheel 18, a drawstring 19 and a fifth elastic member 20. The upper right side of the mounting frame 1 is connected by bolts A first guide sleeve 15 is provided in the first guide sleeve 15, an arc-shaped top rod 16 is slidably provided in the first guide sleeve 15, a second arc-shaped slot 17 is opened on the upper right side of the mounting frame 1, and the upper left side of the mounting frame 1 is provided There is a guide wheel 18, a pull rope 19 is arranged on the clamping plate 13, one end of the pull rope 19 bypasses the guide wheel 18 and is connected to the left side of the second arc-shaped slot 17, between the arc-shaped top rod 16 and the first guide sleeve 15 is provided The fifth elastic member 20 is a compression spring.
[0025] The worker pulls the swing rod 2 to the right, the first elastic member 5 is stretched, the swi...