Bogie rapid simulation method and device
A bogie and fast technology, applied in the field of vehicles, can solve problems such as low efficiency, complex bogie simulation process, and low accuracy, and achieve the effects of reducing simulation costs, improving simulation efficiency and accuracy, and avoiding manual errors
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0050] see figure 1 , is a schematic flow chart of a bogie fast simulation method provided in this embodiment, the method includes the following steps:
[0051] S101: Obtain the working condition content of the bogie industry standard specification.
[0052] In the embodiment of this application, in order to realize the rapid simulation of the bogie, it is first necessary to use existing or future data acquisition methods to obtain the working condition content of different types of bogie industry standards, such as EN, JIS Wait for different types of bogie standard specifications to carry out the working condition content to perform the subsequent step S102.
[0053] Among them, the content of working conditions in the bogie industry standard specification refers to the rigid requirements for various working condition parameters of the bogie according to the industry standard specification. An optional implementation is that the operating conditions of the bogie industry st...
Embodiment 2
[0083] The first embodiment described above describes the technical solution of the method of the present application in detail. Correspondingly, the present application also provides a fast bogie simulation device, which will be introduced below.
[0084] see Figure 10 , Figure 10 It is a structural diagram of a fast bogie simulation device provided by the embodiment of the application, as shown in Figure 10 As shown, the device includes:
[0085] The first acquisition unit 1001 is configured to acquire the working condition content of the bogie industry standard specification;
[0086] The first generation unit 1002 is configured to encapsulate the working condition content of the bogie industry standard specification, perform pre-processing of the bogie rapid simulation, and automatically generate the pre-processing result of the bogie rapid simulation;
[0087] The second acquiring unit 1003 is configured to acquire key information in the simulation report template r...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com