Method for determining patient-specific blood vessel information

The present invention relates to a method for determining patient-specific blood vessel information. More specifically, the present invention relates to a method for determining patient-specific cardiovascular information by applying a simplified coronary circulation model thereto. Furthermore, the present invention relates to a method for determining a blood flow rate for branches of a blood vessel having originated from an artery of each patient. According to the present invention, the method for determining cardiovascular information by using a computer system comprises the steps of: receiving image data including a plurality of coronary arteries having originated from the aorta; processing the image data so as to generate a three-dimensional shape model of the plurality of coronary arteries; simulating a blood flow for the generated three-dimensional shape model of the plurality of coronary arteries; and determining a fractional flow reserve (FFR) of the respective coronary arteries with the blood flow simulation result. In the blood flow simulation step for the three-dimensional shape model of the plurality of coronary arteries, a computational fluid dynamics model is applied to the three-dimensional shape model of the coronary arteries, and a centralized parameter model to be combined with the computational fluid dynamics model uses a simplified coronary circulation model including coronary arteries, capillaries of the coronary arteries, and coronary veins.
Owner:KNU IND COOPERATION FOUND

Fast action sequence and data field algorithm

The invention discloses a fast action sequence and data field algorithm. The fast action sequence and data field algorithm comprises the following steps: step 1, determining combat entities, combat operations and combat missions of adversarial both parties according to a solution deduction plan; step 2, determining an entity model according to the combat entities of the adversarial both parties to determine an attribute parameter, reading a direction graph attribute or a performance attribute according to the plan requirements for antenna parameter configuration and performing enemy state identification; step 3, establishing a series of interrelated and hierarchical action sequences according to the combat missions and analyzing an adversarial relationship; step 4, comprehensively judging whether the simulation is completed or not, ending if yes and returning to the step 3 by advancing a time event sequence if not. According to the fast action sequence and data field algorithm, disclosed by the invention, based on adversarial clustering data mining, a simulation event time sequence can be established, so that the simulation calculation amount among adversarial units can be effectively reduced; meanwhile, fast data field drawing can be performed on electromagnetic situations, so that the simulation efficiency and the visualization effect are improved.
Owner:AIR FORCE EARLY WARNING ACADEMY

High-voltage motor stator coil corona-preventing structure optimizing method based on electric field analysis

The invention relates to a high-voltage motor stator coil corona-preventing structure optimizing method based on electric field analysis. The high-voltage motor stator coil corona-preventing structure optimizing method includes the following steps: determining the stator coil corona-preventing structure analysis modeling portion; obtaining modeling parameters according to the structure and the size of the modeling portion determined in the step (1); building a three-dimensional finite element model of the coil corona-preventing portion according to the modeling parameters obtained in the step (2); defining the characteristics of various materials of a coil and the insulation corona-preventing portion in the calculating model; determining the type of stimulation exerted on the stator coil calculating model and boundary conditions; carrying out finite element calculation and the electric field analysis on the coil calculating model, and judging the problems of the corona-preventing structural design. According to the high-voltage motor stator coil corona-preventing structure optimizing method based on the electric field analysis, the three-dimensional finite element analysis model is built by reasonably simplifying and assuming a practical model, and the visible and accurate corona-preventing layer electric field distribution result is accordingly obtained; in addition, the simulation calculated amount can be effectively reduced, and the simulation efficiency can be improved.
Owner:HUNAN UNIV OF SCI & TECH

A semi-analytical method for calculating high-frequency electromagnetic force of motor by constructing low-frequency harmonic current

The invention discloses a semi-analytical method for calculating high-frequency electromagnetic force of a motor by constructing low-frequency harmonic current, which comprises the following steps of:obtaining a current waveform according to the operation condition of the motor; performing Fourier decomposition on the current based on the current waveform to obtain the amplitude and frequency ofthe fundamental frequency current and each harmonic current; constructing The low frequency harmonic current by using the fundamental frequency current, and the distribution of electromagnetic field and obtaining force in the motor by finite element simulation of the motor with the fundamental frequency current and the low frequency harmonic current. Decomposing The distribution of electromagneticfield and force by two-dimensional Fourier transform in time and space, and obtaining the electromagnetic field and force related to low frequency harmonic current. For the electromagnetic fields andforces related to the low frequency harmonic currents, obtaining the electromagnetic fields and forces introduced by each harmonic current by mapping the frequency and amplitude. The invention has high computational efficiency when the variable frequency speed regulation is operated. The invention has high computational efficiency when the variable frequency speed regulation is operated.
Owner:HUAZHONG UNIV OF SCI & TECH

Voltage safety evaluation method and voltage safety evaluation system of power system

The invention relates to a voltage safety evaluation method and a voltage safety evaluation system of a power system. The voltage safety evaluation method comprises the steps that a plurality of preset operation ways satisfying preset operation conditions are acquired, and a state variable set corresponding to every preset operation way is generated; safety performance of transient voltage corresponding to every preset operation way is evaluated according to a preset fault set; linear fitting of state variable sets of a plurality of target operation ways is carried out to acquire a fitting weight coefficient corresponding to every target operation way; according to the fitting weighting coefficients corresponding to the plurality of target operation ways and the transient voltage safety performance, the transient voltage safety index of the power system in a current operation way is calculated. The voltage safety evaluation method and the voltage safety evaluation system of the power system are advantageous in that the voltage safety index of the current operation way is evaluated in a real-time manner; real-time performance is good, and a simulation calculation amount is small; and real-time on-line safety evaluation is realized, and calculation resources are saved.
Owner:POWER DISPATCHING CONTROL CENT OF GUANGDONG POWER GRID CO LTD

Acoustic target intensity simulation method based on multi-GPU multi-resolution bounce rays

The invention discloses an acoustic target intensity simulation method based on multi-GPU multi-resolution bounce rays, and mainly solves the problems that the time for carrying out sound ray tube bundle splitting calculation on a CPU in a serial mode is long, and real-time forecasting is not facilitated in the prior art. The method comprises the following steps: 1) drawing a simulation model andcarrying out mesh generation; 2) constructing a KD tree for the subdivided model and generating a virtual aperture surface and an angular top ray of a sound ray tube bundle; 3) tracking the angle toprays, if the four angle top rays of the sound ray tube bundle do not intersect with the same triangular surface element, splitting the sound ray tube bundle in parallel until the splitting frequency reaches a set threshold value, and then performing scattering sound field integration; 4) accumulating scattered sound field integral results of each time, and calculating the sound target intensity. The method reduces the simulation calculation amount, improves the sound target intensity simulation speed, can meet the actual engineering requirements, and can be used for the real-time simulation ofthe sound target intensity on a multi-GPU platform.
Owner:XIDIAN UNIV

Non-ferrous metal smelting production, supply and marketing integrated optimization system, method and device

The invention belongs to the field of collaborative manufacturing and intelligent manufacturing, particularly relates to a non-ferrous metal smelting production, supply and marketing integrated optimization system, method and device, and aims to solve the problems of low non-ferrous metal smelting production and marketing decision-making efficiency and poor accuracy. The system comprises a model construction module configured to construct a unit model corresponding to historical operation data of a non-ferrous smelting enterprise by adopting a data driving method; a data simulation module configured to logically connect the unit models according to a smelting process and perform simulation through a DEVS discrete event model to generate simulation data; an agent model generation module configured to merge historical operation data and simulation data and construct an agent model of constraint conditions of a cost objective function and a decision variable; a decision optimization module configured to optimize the agent model through an evolutionary algorithm; and an optimal decision output module configured to generate an optimal decision. According to the invention, the productionand marketing decision efficiency and accuracy of non-ferrous metal smelting are improved.
Owner:INST OF AUTOMATION CHINESE ACAD OF SCI

Reliability simulation method for large-scale power supply system under periodic maintenance condition

ActiveCN110532711ASolve the problem of reliability index calculationThe calculated result is close toSpecial data processing applicationsInformation technology support systemFailure rateReliability theory
The invention discloses a reliability simulation method for a large-scale power supply system under a periodic maintenance condition. The method comprises two situations: the first situation is a large-scale power supply system under the condition of infinite regular maintenance, i.e., the maintenance frequency is not limited, and as long as the time reaches the maintenance period and the system function is determined to be normal, the failed unit is continuously maintained, so that the functions of each unit of the system are recovered to be normal until the system is failed before reaching the next maintenance moment. And the second situation is that the large-scale power supply system is maintained under the condition of limited times of regular maintenance, that is, the maximum maintenance frequency is set, and when the maintenance frequency exceeds the maximum maintenance frequency, the maintenance is not continued until the voting system fails. Reliability indexes of the voting redundant power supply system under the conditions of infinite regular maintenance and finite regular maintenance can be respectively calculated through a calculation process and calculation; wherein the reliability comprises reliability, unreliability and MTBCF, and certainly, under the condition of obtaining an unreliability function of the system, a failure density function and a failure rate function of the periodic maintenance voting system can be approximately obtained according to a related calculation formula in a reliability theory.
Owner:CHINA ELECTRONICS TECH GRP CORP NO 14 RES INST

Method for correcting thermocouple measurement value to obtain bone drilling temperature of actual drilling point

The invention provides a method for correcting a thermocouple measurement value to obtain the bone drilling temperature of an actual drilling point. The method comprises: step one, establishing threekinds of finite element analysis models; step two, carrying out solid bone drilling temperature measurement experiment and extracting highest measured temperature values of a model II and a model III,optimizing the model II and the model III, and applying optimization results to the model I; step three, simulating the optimized model I, model II, and model III and extracting a highest simulated temperature value; step four, calculating relative errors of the highest simulated temperatures of the model II and the model III relative to the model I under different bone drilling parameter combination, carrying out fitting to obtain a relative error formula, and calculating a highest temperature value of the actual drilling point of the model I based on a relative error formula and the highestmeasured temperature values of the model II and the model III; and step five, according to the highest temperature value of the actual drilling point, selecting a bone drilling parameter of a bone surgery operation and controlling a range. In addition, the invention also provides a computer device. Therefore, the accuracy of the highest temperature value of the actual drilling point can be improved.
Owner:HUAQIAO UNIVERSITY

Large-scale power distribution network integral model simplification method applicable to electromagnetic transient simulation

The invention discloses a large-scale power distribution network integral model simplification method applicable to electromagnetic transient simulation. The large-scale power distribution network integral model simplification method comprises the following steps of: dividing a large-scale intelligent power distribution system into two parts, i.e., an external system and a research system; connecting the external system and the research system through a plurality of branches; establishing electromagnetic transient simulation models of the external system and the research system respectively; setting a low-dimension system model order q (q is less than n) according to a simulation actual demand and computing resource, wherein n represents order of the original external system model; selecting a base calculation method corresponding to the number of columns of a matrix B input in an external system state equation; performing re-orthogonalization processing on a base V by using a re-orthogonalization method; calculating that A' is equal to VTAV, B' is equal to VTB, C' is equal to CV and D' is equal to D to obtain a low-dimension simplified system model; and performing simulation computation in linkage with a detailed model of the research system in place of the original external system model to obtain a detailed transient process in the research system. According to the large-scale power distribution network integral model simplification method, the simulation calculation efficiency is increased, large-scale system analysis simulation is oriented, and inevitable choice of operation requirements under various on-line application scenes is met.
Owner:天津天成恒创能源科技有限公司

Optimization design method, device and equipment for automobile shape parameters and storage medium

The embodiment of the invention discloses an optimization design method, device and equipment for automobile shape parameters and a storage medium. The method comprises the steps: carrying out fluid dynamics CFD model design on the automobile to obtain an automobile CFD model; constructing a three-dimensional topological structure population based on a set number of chromosome parameters; sequentially carrying out selection operation, crossover operation and mutation operation on chromosome parameters in the three-dimensional topological structure population to obtain an operated population; calculating the fitness of each chromosome parameter in the population after calculation, and determining a high-quality chromosome parameter according to the fitness; updating the three-dimensional topological structure population according to the high-quality chromosome parameters, returning the chromosome parameters in the updated three-dimensional topological structure population and sequentially performing selection, crossover and mutation operation; determining an optimal chromosome parameter from the high-quality chromosome parameters obtained from the last iteration according to the fitness, and taking the optimal chromosome parameter as an optimal automobile exterior parameter. While the calculation precision is improved, the simulation calculation amount is reduced, and the calculation efficiency is improved.
Owner:软通智慧信息技术有限公司

Method and equipment for correcting thermocouple measurement value to obtain drill bone temperature at actual drilling point

The present invention provides a method for correcting the measured values ​​of thermocouples to obtain the temperature of the drilled bone at the actual drilling point, including: 1. Establishing three finite element analysis models; The highest measured temperature value; optimize Model 2 and Model 3, and apply the optimization results to Model 1; 3. Simulate the optimized Model 1, Model 2, and Model 3, and extract the highest simulated temperature value; 4. Calculate in different Under the combination of drill bone parameters, the relative error of the maximum simulated temperature of model 2 and model 3 relative to model 1, and the relative error formula is fitted, and the model is calculated according to the relative error formula and the maximum measured temperature values ​​of model 2 and model 3 1. The highest temperature value of the actual drilling point; 5. According to the highest temperature value of the actual drilling point, select the bone drilling parameters of the bone surgery and control the range. The invention also provides a computer device to improve the accuracy of the highest temperature value of the drilled bone at the actual drilling point.
Owner:HUAQIAO UNIVERSITY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products