Platform screen door control method and control system
A control method and technology for screen doors, applied in stations, door/window fittings, roads, etc., can solve problems such as affecting system operation efficiency, safety relay control modules without status monitoring and diagnostic prediction measures, etc., to improve operation reliability. and operational efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0063] figure 1 This is a flowchart of a method for controlling a platform screen door provided in Embodiment 1 of the present invention. This embodiment can be applied to the situation of controlling the safety screen door of rail transit. The method can be executed by a screen door controller. Specifically include the following steps:
[0064] S110, parse the received train instruction to obtain the task to be executed.
[0065] Among them, the train command is a command issued by the train to communicate with the platform. Usually, the train command is received by the train-to-ground signal system and forwarded to the screen door controller. After analyzing the train command, the screen door controller can obtain the task to be executed corresponding to the train command. The to-be-executed task may be: a door opening task, a door closing task, or other tasks. For example, when the train is about to enter the station, the train sends an entry instruction, and the screen...
Embodiment 2
[0083] image 3 This is a flowchart of a method for controlling a platform screen door provided in the second embodiment of the present invention. This embodiment can be applied to the situation of controlling the safety screen door of rail transit. The method can be executed by a gate control unit, and the method specifically includes: Follow the steps below:
[0084] S210. Receive the task instruction sent by the screen door controller through a hard wire, and receive the verification instruction sent by the screen door controller through a serial communication bus.
[0085] Among them, the gate control unit and the screen door controller communicate through hard wire and serial communication bus respectively for instruction transmission.
[0086]Optionally, in order to further ensure the reliability of communication between the gate control unit and the screen door controller, and to ensure that the gate control unit executes the task issued by the screen door controller, ...
Embodiment 3
[0108] Figure 4 A schematic structural diagram of a platform screen door control system provided in Embodiment 3 of the present invention, the screen door control system is typically a rail transit platform screen door control system, and the control system can execute the platform screen door provided by any embodiment of the present invention. A door control method, the control system comprises: a screen door controller 10 and a door control unit 30 connected in communication, wherein,
[0109] The screen door controller 10 is used to parse the train command to obtain the task to be executed, according to the task to be executed, send the task command to the gate control unit 30 through the hard wire, and send the verification command to the gate control unit 30 through the serial communication bus; The serial communication bus receives the task execution information of the gate control unit 30, and determines the control result of the platform screen door based on the task...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


