Unlock instant, AI-driven research and patent intelligence for your innovation.

Steel bar truss deck support and construction method thereof

A steel truss and construction method technology, applied to floors, building components, buildings, etc., can solve the problems of high cost and long construction period, and achieve the effect of low cost, short construction period and ensuring stability

Inactive Publication Date: 2020-03-17
SHANGHAI BAOYE CONSTR INDAL FURNACE ENG TECH +1
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Therefore, the technical problem to be solved by the present invention is to overcome the problems of long construction period and high cost in the prior art, so as to provide a steel truss floor deck bearing and construction method with short construction period and low cost

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Steel bar truss deck support and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0020] Such as figure 1 As shown, the present embodiment provides a reinforced truss floor bearing plate, including a beam side formwork 20 arranged between the bearing plate 11 and the bottom support 12, wherein a first timber is arranged along the top of the beam side formwork 20 square 21, a second wooden square 22 is provided along the bottom of the beam side formwork 20, the first wooden square 21 is connected to the bottom end of the bearing plate 11, and the second wooden square 22 leans against the On the bottom support 12 , a back side 23 is provided between the first wood side 21 and the second wood side 22 , and the back side 23 abuts against the beam side formwork 20 .

[0021] The steel truss floor bearing plate support in this embodiment includes a beam side formwork 20 arranged between the bearing plate 11 and the bottom support 12, wherein a first wooden square 21 is arranged along the top of the beam side formwork 20, and along the The bottom of the beam side...

Embodiment 2

[0025] This embodiment provides a construction method for a reinforced truss floor bearing, which uses the steel truss floor bearing described in Embodiment 1 for construction, and specifically includes the following steps: Step S1: Lay out under the bearing 11 Bottom support 12, the steel truss floor deck support is arranged between the bottom support and the bearing plate; Step S2: pouring concrete in the beam side formwork, after the strength of the concrete meets the requirements , remove the bottom support and the steel truss floor bearing.

[0026] When arranging the steel truss floor bearing plate support, first install the beam side formwork 20 between the bottom support 12 and the bearing plate 11; then install the first wooden square 21 on the top of the beam side formwork 20, And the first wooden side 21 is fixed on the bottom of the beam side formwork 20 and the bearing plate 11, the second wooden side 22 is installed at the bottom of the beam side formwork 20, and...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a steel bar truss deck support and a construction method thereof. The steel bar truss deck support comprises a beam side template arranged between a bearing plate and a bottomsupport, wherein a first wood batten is arranged along the top of the beam side template, a second wood batten is arranged along the bottom of the beam side template, the first wood batten is connected with the bottom end of the bearing plate, the second wood batten is abutted against the bottom support, a back batten is arranged between the first wood batten and the second wood batten, and the back batten is abutted against the beam side template. The steel bar truss deck support has convenient installation, good fixing effect and low cost.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a reinforced truss floor bearing plate support and a construction method. Background technique [0002] Reinforced truss floor decks are floor components that meet the prefabrication rate requirements of prefabricated structures, and are generally used in steel structure frames or prefabricated concrete frame structures. The steel structure frame structure is welded connection; the prefabricated concrete frame structure mostly uses the support frame. If welded connections are used, the construction period will be long; if support frames are used, in the past construction, a full-scale scaffolding is often used to support the bottom of the steel truss floor deck. It takes up a lot of steel pipe scaffolding, and it also requires a lot of manpower and time to set up. For the steel truss floor deck, which has the feature of being free of support, it will be a great was...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04B5/32E04G21/16
CPCE04B5/32E04G21/16
Inventor 李贤杰岑江华李杰赖启均
Owner SHANGHAI BAOYE CONSTR INDAL FURNACE ENG TECH