Boiler corrosion-resistant layer spraying device for urban garbage combustion
A technology of corrosion-resistant layer and municipal waste, applied in the direction of injection device, etc., can solve the problems of high labor cost, low efficiency, inability to meet production needs, etc., and achieve the effect of high degree of automation and good effect.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] Such as Figure 1-5 As shown, a boiler corrosion-resistant layer spraying device for urban waste combustion includes a support base frame 1 and an n-shaped carrier frame 2, one side of the top of the support base frame 1 is welded with a paint bucket 13, and the other side of the support base frame 1 top is The n-shaped carrier frame 2 is welded on the side, and the bottom side of the n-shaped carrier frame 2 is welded with an annular slide rail 7, and the top of the annular slide rail 7 is slidably connected to the rotary placement platform 9 through a slider 32, and the top of the n-shaped carrier frame 2 is a The No. 1 electric lifting rod 21 is installed on the side through the fastening bolt, and the output end of the No. 1 electric lifting rod 21 is installed with the No. 1 nozzle 19 through the No. No. 2 electric lifting rod 23 is installed, and the output end of No. 2 electric lifting rod 23 bottom is installed No. 2 nozzle 28 through No. The liquid inlet end o...
Embodiment 2
[0038] Such as Figure 1-5 As shown, a boiler corrosion-resistant layer spraying device for urban waste combustion includes a support base frame 1 and an n-shaped carrier frame 2, one side of the top of the support base frame 1 is welded with a paint bucket 13, and the other side of the support base frame 1 top is The n-shaped carrier frame 2 is welded on the side, and the bottom side of the n-shaped carrier frame 2 is welded with an annular slide rail 7, and the top of the annular slide rail 7 is slidably connected to the rotary placement platform 9 through a slider 32, and the top of the n-shaped carrier frame 2 is a The No. 1 electric lifting rod 21 is installed on the side through the fastening bolt, and the output end of the No. 1 electric lifting rod 21 is installed with the No. 1 nozzle 19 through the No. No. 2 electric lifting rod 23 is installed, and the output end of No. 2 electric lifting rod 23 bottom is installed No. 2 nozzle 28 through No. The liquid inlet end o...