Reinforcement construction method of shield overhaul well
A construction method and maintenance well technology, which can be applied to wellbore lining, shaft equipment, earthwork drilling and production, etc., and can solve the problems of low strength of shield maintenance wells
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and examples.
[0019] Such as figure 1 As shown, the embodiment of the present invention provides a shield tunnel maintenance well reinforcement construction method, the shield tunnel maintenance well reinforcement construction method includes S100, the underground pipeline in the reinforcement site is detected before construction, so as to avoid damage to the underground pipeline during the construction process . When an underground pipeline is detected, the property rights department should be communicated in time to carry out pipeline relocation. S300, drilling a plurality of boreholes in the reinforcement field. S800 uses double-pipe rotary nozzles to transport high-pressure airflow and cement slurry r...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com