Unlock instant, AI-driven research and patent intelligence for your innovation.

A method for controlling elevator calls outside the hall during the peak period of people flow

A control method and peak period technology, applied in the field of elevators, can solve the problems of wasting lunch time and lunch break, and stranded people waiting for elevators, and achieve the effect of avoiding excessively long stranded time.

Active Publication Date: 2021-09-07
FOSHAN WABON ELECTRONICS TECH
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Such a calling method cannot make two elevators reach the same floor at the same time, which will lead to that when the number of people waiting on a floor is greater than the maximum capacity of one elevator, only one elevator will not be able to reach this floor. Most of the waiting people on the floors carry away or take all the passengers away. In some commercial and residential mixed-use buildings, this situation often occurs during peak hours when the company's floor is off work; the existing calling method is After waiting for the first elevator to run, the waiting staff presses the hall call button again to call the elevator again. This will cause the waiting staff to stay, and the waiting staff on this floor may appear repeatedly The phenomenon of waiting for multiple elevators to complete the loading work of the waiting staff wastes the noon meal and lunch break time of the working staff

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A method for controlling elevator calls outside the hall during the peak period of people flow

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0022] A kind of elevator call control method outside the hall during the peak period of the flow of people in this embodiment, such as figure 1 As shown, it includes elevator A and elevator B linked by the main control module and the call module used to send call instructions to the main control module. The early call control method outside the hall also includes a number recognition module, the number recognition module is a camera, and the call module is installed on each floor, at least in the waiting hall of each floor above the 10th floor of the building. The number recognition module, the number recognition module is used to collect the data of the number of people waiting on the floor where it is located and transmit it to the main control module, and the waiting personnel press the call button of the call module to send a call instruction to the main control module ; Elevator A and elevator B have the same maximum capacity of Z people, Z=10.

[0023] During use, when...

Embodiment 2

[0027] The difference between this embodiment and Embodiment 1 is that in this embodiment, 10 passengers on the 15th floor enter the elevator A, and 3 people enter the elevator B. At this time, the elevator A reaches the maximum capacity. , Elevator B did not reach the maximum load capacity. Elevator A and Elevator B are in the process of descending. Elevator A only operates according to the instructions issued by the control panel. Elevator B will run to the 11th floor while operating according to the instructions issued by the control panel. Stop for passenger carrying work, and then continue to run according to the instructions issued by the control panel to execute and complete the call instructions for the 2 call floors.

Embodiment 3

[0029] The difference between this embodiment and Embodiment 1 is: in this embodiment, the number of people waiting to take the elevator on the 15th floor is 22, and the number of people entering elevator A and the number of elevator B have reached the maximum capacity of the elevator. The call instruction issued by the 11th floor is canceled under the function of the main control module, and elevator A and elevator B will run according to the instruction issued by the control panel. The rest of the waiting staff on the 15th floor and the waiting staff on the 11th floor need to call again.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a method for controlling elevator calls outside the hall during the peak period of people flow. The method identifies the number of people waiting for elevators through the number identification module in the elevator call floor. When two elevators are on the first floor at the same time, they are in a state where no one is riding. Next, when the main control module receives downward calls from two different floors within a certain period of time, if the number of people waiting on the floor where the call is issued later is greater than the maximum capacity of a single elevator, the call is issued first. If the number of people waiting on the floor of the elevator command is less than the maximum capacity of a single elevator, the main control module will control both elevators to directly reach the floor with more people waiting to carry passengers. The present invention has the ability to control two elevators to reach the same floor according to whether the number of people waiting for the elevator exceeds the maximum load capacity of a single elevator, which is beneficial to avoiding a large number of people staying on the floor where the company is located for too long during the rush hour, so that the working personnel can fully Take advantage of lunch and lunch breaks.

Description

technical field [0001] The invention relates to the technical field of elevators, in particular to an elevator call control method outside a hall during a peak period of people flow. Background technique [0002] At present, in the application of elevators on the market, when multiple floors simultaneously press the down call button on the call module outside the hall to make a call, the main control module of the elevator will call according to the order in which the call instructions are received. Arrange the order in which the elevators arrive at the floors so that when two different floors in the same building make hall calls at the same time or within a short period of time, if there are two linked elevators in the building, each of the two floors There will be 1 elevator arriving to carry passengers. [0003] Such a calling method cannot make two elevators reach the same floor at the same time, which will lead to that when the number of people waiting on a floor is gr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): B66B1/20B66B1/34B66B5/00
CPCB66B1/20B66B1/3476B66B5/0012
Inventor 陈嘉劲潘伟欣
Owner FOSHAN WABON ELECTRONICS TECH