A technology of inclined drilling and construction method, applied in drilling equipment, directional drilling, earth-moving drilling, etc., can solve the problems of inaccurate construction, accidents, movement trajectory deviation, etc., saving time, manpower and material resources, measuring Correction is accurate and the effect of coordinate system is realized

Active Publication Date: 2020-04-10
山东黄金矿业股份有限公司新城金矿
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

During the construction process, the following problems will be encountered: (1) Inclined drilling is non-vertical drilling construction. Due to the weight of the drill bit, its trajectory will be offset, and the construction will not be accurate, which will easily affect other roadways or transportation systems, and even (2) Due to historical reasons, there are many coordinate systems for underground roadways, and there are often cases where different coordinate systems are used for different roadways. The fixed error between the holes is not precise and clear, and the coordinate system of the starting position and the end position of the drilling cannot be clearly unified, which creates obstacles to the construction; (3) also due to historical reasons, only one control point is required for the roadway, and there is no backsight direction , cannot achieve accurate fixed point

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Inclined drilling construction method
  • Inclined drilling construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0020] The technical scheme of the present invention is described in detail below in conjunction with accompanying drawing:

[0021] Such as figure 1 with 2 , Xincheng Gold Mine -466m fine ore system transformation, need to construct a -466m to -530m fine ore recovery shaft (hole to be constructed). The hole is designed from the -466m construction drilling rig chamber, and a 58m long hole with an inclination angle of 81° is constructed by raising drilling. After passing through the -530m slag storage chamber, it is reversed into a φ1.4m fine ore recovery shaft .

[0022] In the figure: 1. Main shaft, 2. Lifting shaft, 3. Auxiliary ramp, 4. Pedestrian equipment shaft, 5. Holes to be constructed.

[0023] Existing construction difficulties:

[0024] 1. Since the -466m powder ore recovery lane was a project in the 1990s, the survey control point has been basically destroyed, and its coordinate system is -383m. There is only one roof control point at the import site, and there...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an inclined drilling construction method. The inclined drilling construction method comprises the steps that 1, point fixing work of all roadways involved in the construction process is completed; 2, if the coordinate system of the roadway where the inclined drilling initial position is located and the coordinate system of the roadway where the final position are not the same coordinate system, the fixed error between the two coordinate systems is measured, and the coordinate systems of the initial position and the final position of inclined drilling are unified; and 3,drilling parameters are adjusted according to the drilling track deviation caused by the dead weight of a drill bit, and then drilling is started. According to the inclined drilling construction method, the angle of a drilling machine is corrected through the parabolic path formula of the drill bit during inclined drilling, and it is guaranteed that inclined drilling construction is in place andaccurate; meanwhile, on-site point fixing is fast completed with the help of a gyroscope, a traditional single-well directional point guiding manner is replaced, unification of the coordinate systemsis further achieved through repetition measurement, and the inherent error is eliminated.

Description

technical field [0001] The invention relates to a method for constructing inclined boreholes. Background technique [0002] In the process of mine reconstruction and construction, it is often necessary to construct new shafts, especially inclined shafts, on the basis of existing roadways and mines to meet production needs. During the construction process, the following problems will be encountered: (1) Inclined drilling is non-vertical drilling construction. Due to the weight of the drill bit, its trajectory will be offset, and the construction will not be accurate, which will easily affect other roadways or transportation systems, and even (2) Due to historical reasons, there are many coordinate systems for underground roadways, and there are often cases where different coordinate systems are used for different roadways. The fixed error between the holes is not precise and clear, and the coordinate system of the starting position and the end position of the drilling cannot...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21D9/02E21D9/10E21B7/04E21B7/10E21B44/00
CPCE21B7/04E21B7/10E21B44/00E21D9/02E21D9/10
Inventor 王海卫张鹏涛张肖亮杜益臧波周波王京生马洪江王金纯王秉涛
Owner 山东黄金矿业股份有限公司新城金矿
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products