Power communication network work order scheduling method based on DBSCAN algorithm and KMP mode matching method
A power communication network, pattern matching technology, applied in character and pattern recognition, computing, computer parts and other directions, to achieve the effect of fast clustering and effective noise processing
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0058] Such as figure 1 As shown in the figure, the first embodiment of the work order scheduling method of the electric power communication network based on the DBSCAN algorithm and the KMP pattern matching method of the present invention includes a worker database, and the information of the worker database includes the name of the worker, the corresponding number of the worker, and the professional skill of the worker Proficiency, worker performance assessment, worker’s work order completed on the day, order received on the day, daily inspection route, work order completion efficiency, worker’s professional skills proficiency, worker performance assessment, worker’s completed work order on the day, The order receiving situation, daily inspection route, and information in the worker database are all stored in pinyin, which means that the above-mentioned content is all stored in pinyin. It is characterized in that it includes the following steps:
[0059] S1. According to the...
Embodiment 2
[0084] This embodiment is similar to Embodiment 1, the difference is that the specific steps of step S3 in this embodiment are as follows:
[0085] S31. order m l =0,n=1,w l =0; among them, means m l The number of current matching items of the lth worker, n indicates the priority of the factors affecting the current operation and maintenance work order, w indicates the sum of priorities of all matching items, and l indicates the corresponding number of the worker;
[0086] S32. Set the pinyin of the worker database to be matched as the main string s, and then find out the pinyin pattern string p of the highest priority operation and maintenance work order influencing factor that has not been matched in the main string s;
[0087] S33. Find the common element with the longest prefix in the pattern string p; form a set P=p with all the elements in the entire pattern string p 0 p 1 ...p j-1 p j , for a set P, if exists:
[0088] p 0 p 1 ...p k-1 p k =p j-k p j-k+1 .....
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com