Complete equipment for mechanized operation of mountain tunnel secondary lining steel bar
A complete set of equipment and tunnel technology, applied in the direction of tunnel lining, tunnel, mining equipment, etc., can solve the problems of high labor intensity, easy installation quality, large installation workload, etc., to reduce labor intensity, improve construction quality, and improve construction. The effect of efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Please refer to figure 1 and figure 2 , figure 1 Shown is a structural schematic diagram of a complete set of equipment 100 for the mechanized operation of the second lining steel bar of a mountain tunnel, figure 2 Shown is a schematic diagram of the combined structure of the hoop reinforcement installation group 110 and the chassis platform 150 . This embodiment mainly includes a circumferential reinforcement installation group 110, a longitudinal reinforcement installation group 130 and a chassis platform 150, the circumferential reinforcement installation group 110 is detachably connected to the chassis platform 150, and the longitudinal reinforcement installation group 130 is detachably connected to the chassis platform 150. The hoop steel bar installation group 110 includes a hoop mechanical arm guide rail 111 and a hoop support arm 113, and the hoop mechanical arm guide rail 111 and the hoop support arm 113 are detachably (bolted) connected. The circular mani...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


