Kilometer-level hybrid beam cable-stayed bridge closure method
A closing and meter-level technology, applied in the closing field of kilometer-level hybrid girder cable-stayed bridges, can solve the problems of changing components and affecting the quality of the bridge, and achieve the effects of reducing temperature dependence, ensuring the quality of the bridge, and avoiding local changes
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] The specific embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings, so that those skilled in the art can understand the present invention. However, it should be clear that the embodiments described below are only some, not all, embodiments of the present invention. Without departing from the spirit and scope of the present invention defined and determined by the appended claims, all other embodiments obtained by those skilled in the art without any creative effort shall fall within the protection scope of the present invention.
[0032] A method for closing a kilometer-level hybrid girder cable-stayed bridge is provided, which includes:
[0033] S1. Determine the thrust direction of the main girders on both sides of the kilometer-level hybrid girder cable-stayed bridge according to the unilateral displacement amount, and the unilateral displacement amount=(the actual length of the Helongkou-the reference len...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com