A train ato fast target curve planning method and system
A target curve and fast technology, applied in the field of rail transit, can solve the problems of complex speed limit change types, unable to effectively solve the problem of curve planning, unable to obtain the target operation curve, etc., to simplify the curve planning process, easy to implement, and easy to operate. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0067] The present invention will be further described below with reference to the accompanying drawings and specific embodiments.
[0068] like Figure 4 As shown, the train ATO fast target curve planning method of the present embodiment is suitable for train operation sections with complex speed limit changes, wherein the train operation section with complex speed limit changes refers to the speed limit value change in the operation section that does not have monotonicity, Sometimes high and sometimes low, there are multiple high speed limit sections and multiple low speed limit sections in the entire interval, which can be as follows image 3 The method specifically includes the steps:
[0069] 1) Divide the train operation section into several sub-sections of conventional speed limit change types;
[0070] 2) Carry out fast target curve planning for each sub-interval of conventional speed limit change types respectively, and obtain several corresponding fast target curve...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com