Embodiment 1
[0041] combine figure 1 and figure 2 , the project of this embodiment is to build an accident slurry tank foundation (i.e. new foundation 2, and now equipment 6 is the accident slurry tank) on the site where the fan foundation (i.e. construction waste foundation 1) was originally provided with, the original discarded increase The foundation of the fan is buried below zero meters.
[0042] In this embodiment, the method for secondary utilization of the above-mentioned construction waste foundation 1, the steps are as follows:
[0043] 1. Analysis and calculation
[0044] According to the engineering drawings, analyze the status quo of the existing abandoned foundation (that is, the construction waste foundation 1), including the size, elevation, buried depth, and damage of the abandoned foundation, and conduct preliminary on-site verification. Follow-up work will be carried out after there is no major discrepancy.
[0045] According to the geological survey report, analyze ...
Embodiment 2
[0056] The project of this embodiment is to build a new process water tank foundation (i.e. a new foundation, the equipment is the absorption tower) on the site where the absorption tower foundation (i.e. the construction waste foundation) was originally arranged, and the original waste absorption tower foundation is embedded in Below zero meters.
[0057] In this embodiment, the method for secondary utilization of the above-mentioned construction waste foundation, the steps are as follows:
[0058] 1. Analysis and calculation
[0059] According to the engineering drawings, analyze the status quo of the existing abandoned foundation (that is, the foundation of construction waste), including the size, elevation, buried depth, and damage of the abandoned foundation, and conduct a preliminary on-site verification. If there is no major discrepancy, follow-up work will be carried out.
[0060] According to the geological survey report, analyze the existing foundation conditions, i...