Steel structure wind-resistant tower-type parachuting training device
A training device and steel structure technology, applied in the training of skydivers, hoisting devices, parachutes, etc., can solve the problems of inconvenient maintenance, poor wind resistance, and high construction cost, and achieve increased difficulty, good wind resistance, The effect of saving length
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0084] In order to fully understand the technical content of the present invention, the technical solutions of the present invention will be further introduced and illustrated below in conjunction with specific examples, but not limited thereto.
[0085] like Figure 1 to Figure 5 Shown, be the embodiment one of a kind of steel structure anti-wind tower skydiving training device of the present invention, comprise main tower 10, and two tower arms 20 that are connected with main tower 10 sides, main tower 10 and tower arm 20 all It is a frame-shaped steel structure; the tower arm 20 is balancedly distributed on the periphery of the main tower 10; it also includes a traction mechanism 30 arranged on the tower arm 20, and the traction mechanism 30 is arranged at the front end of the tower arm; the traction mechanism 30 includes a traction rope 8, a traction rope 8 directly leads vertically downwards.
[0086] The rear end of the tower arm 20 is hingedly connected with the main t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com