Optimal day-ahead load scheduling method based on total demand flexibility
A load scheduling, flexible technology, applied in the communication network, resources, marketing and other directions with energy trade/energy transmission authority, can solve the problem of lack of responsive load day-ahead optimization scheduling method, etc., to achieve the effect of refinement
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] An optimal day-ahead load scheduling method based on aggregate demand flexibility, such as figure 1 As shown, this embodiment includes the following steps:
[0038] Step S1, collect the household appliance load and total household load data of multiple users, and collect household appliance load and household total load data in a period of 15 minutes. Household appliances include air conditioners, electric water heaters, microwave ovens, hair dryers, washing machines, and computers.
[0039] Step S2, using some residential users as flexible resources, dividing flexible resources into transferable loads and cuttable loads, aggregating the total load, cuttable loads and transferable loads, and obtaining their aggregated maximum load curves and aggregated loads respectively Load minimum curve. The transferable load includes household appliances that work for a short time, and the load that can be cut includes household appliances that work for a long time or continuously...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


