Gas heated efficient cracking gasifier for household garbage pyrolysis and gasification
A technology for pyrolysis gasification and domestic waste, which is applied in incinerators, combustion methods, combustion types, etc., and can solve problems such as shrinking the available space inside the gasification chamber.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] For example figure 1 -example Figure 5 Shown:
[0027] The present invention provides a domestic garbage pyrolysis gasification gas heat-assisted high-efficiency cracking gasification furnace. The bottom position of the gasification chamber 2, the control electrical box 4 is embedded and connected with the gasification chamber 2, the ventilation pipe 5 is connected with the gasification chamber 2, and the gasification chamber 2 and the processing chamber 1 are an integrated structure The gasification chamber 2 includes an outer frame 21, a lifting block 22, a guide frame 23, an elastic strip 24, and a connecting rod 25, and the lifting block 22 is embedded in the top position of the connecting rod 25, and the guide frame 23 is connected to the outer The frame 21 is an integrated structure, the elastic bar 24 is installed between the connecting rod 25 and the outer frame 21 , and the connecting rod 25 is movably engaged with the guide frame 23 .
[0028] Wherein, the...
Embodiment 2
[0034] For example Image 6 -example Figure 8 Shown:
[0035]Wherein, the crushing plate b1 includes a contact block b11, a clearing plate b12, a telescopic frame b13, and a bottoming plate b14. Between the adjacent contact blocks b11, the telescopic frame b13 is installed between the cleaning board b12 and the bottoming board b14. There are four cleaning boards b12, which are evenly formed between two adjacent contact blocks b11. Parallel distribution, through the throwing force generated by the swing of the object, the cleaning plate b12 can push out the glass slag between two adjacent contact blocks b11.
[0036] Wherein, the clearing plate b12 includes an outer pushing plate c1, an elastic ring c2, and a close-fitting plate c3, the elastic ring c2 is installed between two outer pushing plates c1, and the close-fitting plate c3 and the outer pushing plate c1 are An integrated structure, the said clinging plate c3 is provided with two, and evenly distributed symmetricall...