A detection device for construction engineering and using method
A detection device and construction engineering technology, applied in the direction of measuring devices, mechanical devices, mechanical roughness/irregularity measurement, etc., can solve problems such as poor detection accuracy, improve efficiency, reduce work intensity, and improve accuracy Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] refer to Figure 1-3 , a detection device for construction engineering, comprising a storage board 1, a plurality of first sliding cavities 7 are provided inside the storage board 1, two third positioning grooves 11 are provided at the upper end of the storage board 1, and the upper end of the storage board 1 and The upper end of the first sliding chamber 7 is provided with the same number of lifting grooves 10 as the first sliding chamber 7, and one end of the storage board 1 is provided with two second positioning grooves 9, and one end of the storage board 1 is located in the two second positioning grooves. One side of 9 is provided with a first positioning groove 8.
[0040] refer to figure 1 , image 3 and Figure 4, also includes: a measuring rod 2 installed inside the first sliding chamber 7 for measuring the distance between the storage board 1 and the wall. The measuring rod 2 includes a rectangular shaft 201, a first fixed mount 202, a first hollow detecti...
Embodiment 2
[0047] Embodiment two: a kind of using method of detection device and using method for construction engineering, its steps are:
[0048] Step 1: Forcibly rotate the two second rotating handles 503 to adjust the position of the height-limiting plate body 501 from the storage plate 1, thereby limiting the position of the measuring rod 2;
[0049] Step 2: Forcibly rotate the two first threaded rods 404 to adjust the position of the lower limit board body 401 from the storage board 1, so as to limit the position of the measuring rod 2;
[0050] Step 3: Holding two hand handles 12, place the device on one side of the wall, so that the two second hollow detection wheels 303 are closely attached to the wall;
[0051] Step 4: Vertical sliding device to detect the flatness and hollowness of the wall. When the wall is raised, the measuring rod 2 will be pushed out by the wall and slide towards the direction close to the height limit mechanism 5. When the wall is sunken, the rectangular ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


