Double-layer drainage type bridge frame
A kind of bridge, double-layer technology, applied in the field of double-layer drainage bridge, can solve the problem of water accumulation that is difficult to quickly evaporate and drain, and achieve good protection and speed up the effect of drainage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] refer to Figure 1-2 , a double-layer drainage bridge, including a cable box 1 and a waterproof cover plate 2 installed on the top of the cable box 1, a load-bearing plate 3 is installed in the cable box 1, the load-bearing plate 3 is a mesh plate or a grid plate, and the load-bearing plate The bottom of 3 is symmetrically equipped with two water guide plates 4, and the middle part of each water guide plate 4 is provided with a strip-shaped mouth 41, the water guide plate 4 is an arc with an opening upward, and the strip-shaped mouth 41 is located at the bottom of the water guide plate. 4, the inner bottom wall of the cable box 1 is symmetrically provided with two water diversion plates 5 with drain outlets 6, and a waterproof cloth 7 is glued between the two water diversion plates 5, and the inner bottom wall of the cable box 1 Offer U-shaped groove 8, U-shaped groove 8 comprises horizontal groove and two vertical grooves, the position of drain outlet 6 on the water di...
Embodiment 2
[0029] refer to Figure 3-4 , the present embodiment differs from Embodiment 1 in that: the side wall of the cable box 1 is symmetrically provided with a plurality of ventilation mechanisms, and each ventilation mechanism includes a plurality of horizontal grooves 19 opened in the side wall of the cable box 1 Each horizontal groove 19 is sealed and slidably provided with a sealing plate 20, and a return spring is connected between the sealing plate 20 and the inner wall of the horizontal groove 19, and the side of each sealing plate 20 away from the bearing plate 3 is fixedly provided with Connecting rods, one end of each connecting rod away from the corresponding load-bearing plate 3 runs through the side wall of the horizontal groove 19 and is fixedly connected with the wing plate 16, and each horizontal groove 19 is connected with the inside of the cable box 1 with an air intake pipe 17, each horizontal The groove 19 is connected with the outside of the cable box 1 with an ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


