Connecting piece of fabricated floor slabs and using method
A prefabricated and connector technology, applied in floors, building components, buildings, etc., can solve the problems of slow installation and construction progress, weak installation, floor unit structure and assembly structure can not meet customer needs, etc., to improve installation and The effect of removal efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] The following description serves to disclose the present invention to enable those skilled in the art to carry out the present invention. The preferred embodiments described below are only examples, and those skilled in the art can devise other obvious variations.
[0030] Such as figure 1 As shown, the connector of the prefabricated floor slab of the present invention includes a connecting plate 1, a channel steel 3, a pull-up fixing device 4, a pressing device 5, a steel bar 6 and a docking device 7; wherein the long sides of the connecting plate 1 Continuous square tooth structures are respectively provided, and the middle part of the connecting plate 1 is provided with a plurality of countersunk holes. The connecting plate 1 is a two-sided tooth structure with continuous square tooth structures on both sides of the long side, or two pieces with only one side The long side is provided with a continuous square tooth structure, and the long side on the other side is a...