Fabricated column positioning grouting device and method
A positioning device and assembled technology, applied in the direction of structural elements, building components, building reinforcements, etc., can solve the problems of cumbersome construction process, large labor consumption, materials and time, etc., to reduce construction machinery and equipment, ensure smoothness and Firmness, quality improvement effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 example
[0033] An assembled column positioning grouting device, comprising:
[0034] Enclosing device, it comprises several baffles 9, and baffles 9 are connected end to end to form a limiting cavity;
[0035] A positioning device, which is arranged in the limiting cavity, the positioning device includes a positioning tube 7, a through hole 701 is provided on the positioning tube 7, and the grouting pipe 5 and the exhaust pipe 3 are communicated on the positioning tube 7, More specifically, metal bellows are used for the grouting pipe 6 and the exhaust pipe 3 .
[0036] By setting the positioning device, it can be positioned during on-site grouting to ensure its verticality.
[0037] As the first embodiment of the present invention, it also has the following additional technical features:
[0038] It also includes a diagonal bracing device, which includes triangular support rods 4, to ensure the maintenance molding strength after grouting.
[0039] The front end of the support rod ...
no. 2 example
[0044] The second embodiment of the present invention: a prefabricated column positioning grouting method, comprising the following steps:
[0045] Step 1: Pre-embed a positioning device at the bottom of the vertical central axis of the structural column 10, and the positioning tube 7 on the positioning device exceeds the bottom of the structural column 10 to obtain a prefabricated column;
[0046] Step 2: Embed a positioning steel plate 8 on the concrete surface, hoist the prefabricated column above it, set up a diagonal bracing device on the concrete surface, support the outer wall of the prefabricated column with the support rod 4, and then place the positioning tube 7 in the positioning device Welding and fixing with the positioning steel plate 8;
[0047] Step 3: Erect the enclosure device on the outer wall of the prefabricated column;
[0048] Step 4: Carry out grouting from the grouting pipe 5 until the exhaust pipe 3 overflows, and the grouting is finished.
[0049] ...