Air conditioner, air conditioning control method, and storage medium
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 example
[0036] In the first embodiment, when the pre-air conditioning operation setting is performed and the charging plug 24 is connected during the charging prohibition period, the storage battery 101 is not charged with the power from the power supply device 20 , but is charged with the The electric power of the power supply device 20 operates the air conditioning unit 105 . In addition, in the first embodiment, when the pre-air conditioning operation setting is performed and the charging plug 24 is connected, the storage battery 101 is charged with the electric power from the power supply device 20 during the period other than the charging prohibition period. and the air conditioning unit 105 operates.
[0037] figure 2 It is a flowchart showing an example of the control procedure of the first embodiment.
[0038] The main control unit 1021 sets the charging prohibition period based on the operation result obtained by the user operating the operation unit 108 (step S1 ). Next,...
no. 2 example
[0062] In the second embodiment, when the pre-air conditioning operation setting is performed and the charging plug 24 is connected, the electric power supplied from the power supply device 20 is used to supply power to the air conditioner based on priority outside the charging prohibition period. The unit 105 supplies or charges the storage battery 101 .
[0063] Figure 4 It is a flowchart showing an example of the control procedure of the second embodiment. It should be noted that the same reference numerals are used for the same processing as in the first embodiment, and description thereof will be omitted.
[0064] The control unit 102 proceeds to steps S1-S3 ( figure 2 ) processing. It should be noted that the control unit 102 performs steps S8 to S13 ( figure 2 ) processing.
[0065] When the current time is included in a time zone other than the charging prohibition time zone, the main control unit 1021 acquires the priority based on the operation result obtaine...
no. 3 example
[0074] In the third embodiment, when the pre-air conditioning operation setting is performed and the charging plug 24 is connected, the electric power supplied from the power supply device 20 is supplied to the storage battery 101 and the air conditioner 105 outside the charging prohibition period. . Furthermore, in the third embodiment, when the charging rate of the battery 101 reaches a predetermined value, the supply of electric power to the battery 101 is stopped and electric power is supplied to the air conditioner 105 .
[0075] Figure 5 It is a flowchart showing an example of the control procedure of the third embodiment. It should be noted that the same reference numerals are assigned to the same processing as in the first embodiment, and description thereof will be omitted.
[0076] The control unit 102 proceeds to steps S1-S3 ( figure 2 ) processing. It should be noted that the control unit 102 proceeds to steps S8 to S13 ( figure 2 ) processing. Next, the c...
PUM

Abstract
Description
Claims
Application Information

- Generate Ideas
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com