[0003] Project cost refers to the construction cost that constitutes the estimated or actual expenditure of the project during the construction period. However, in the process of construction cost, the price is easy to change, and now it is usually necessary to be notified or inquired abo...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM-based whole-process engineering cost consultation system
  • BIM-based whole-process engineering cost consultation system
  • BIM-based whole-process engineering cost consultation system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them.

[0030] refer to Figure 1-5 , a BIM-based whole-process engineering cost consulting system, including BIM model building unit, cost management unit and user experience unit, BIM model building unit is composed of information data collection module, BIM database module and Revit modeling module, BIM database module Connect with the background database through ODBC technology to transfer data. The cost management unit includes project estimation module, project budget estimation module, construction drawing budget module, completion settlement module, real-time price collection module and project progress control module. The user experience unit includes r...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the technical field of engineering cost, in particular to a BIM-based whole-process engineering cost consultation system, which comprises a BIM model construction unit, a costmanagement unit and a user experience unit, and is characterized in that the BIM model construction unit is composed of an information data acquisition module, a BIM database module and a Revit modeling module; the BIM database module is in butt joint with the background database to transmit data, and the cost management unit comprises a project estimation module, a project rough calculation module, a construction drawing budget module, a completion settlement module, a real-time price collection module and a project progress control module. And the user experience unit comprises a real-timeprice change query module, a 3D model development module and a user feedback module, the real-time price change query module adopts a real-time information prompt mode, and the 3D model development module adopts a holographic projection technology. According to the invention, comprehensive consultation experience can be provided for customers, and the customers can know the real-time cost change situation in time.

Description

technical field [0001] The invention relates to the technical field of engineering cost, in particular to a BIM-based whole-process engineering cost consulting system. Background technique [0002] With the rapid development of the national economy, the rapid development of the engineering construction industry has put forward higher requirements for the quality and comprehensive benefits of engineering construction. In order to shorten the construction period of the project and facilitate the digital management of the project, BIM is used in the engineering design to integrate the engineering information resources in different stages of the project. [0003] Project cost refers to the construction cost that constitutes the estimated or actual expenditure of the project during the construction period. However, in the process of construction cost, the price is easy to change, and now it is usually necessary to be notified or inquired about by someone to know the price change,...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06F30/13G06Q10/10G06Q30/02G06Q50/08
CPCG06F30/13G06Q10/103G06Q30/0283G06Q50/08
Inventor 林翰李炼祥梁灶明
Owner 广东展诚工程咨询有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products