Intelligent workshop active scheduling method based on VCG auction
A scheduling method and active technology, applied in the field of intelligent workshops, can solve the problems of lack of in-depth research on key technologies of intelligent body interaction mechanism
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031]The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work shall fall within the protection scope of the present invention.
[0032]In order to make the above-mentioned objects, features and advantages of the present invention more obvious and understandable, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0033]Consider how to realize active scheduling of 5 workpiece agents in a single machine, and analyze the active scheduling method of intelligent workshop based on VCG auction (s...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


