Method for recovering corner ore body
An ore body and edge technology, which is applied in the field of mining edge ore bodies, can solve the problems of ore loss rate, increased dilution rate, small ore volume, and increased cost per ton of ore recovered, so as to improve efficiency and extend service. Years, the effect of increasing the ore recovery rate
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] as attached figure 1 Shown, a kind of method for back mining edge ore body that one embodiment of the present invention provides, described method comprises the following steps:
[0032] During the construction of the transport roadway outside the vein, the ore is connected to the ore body, and is pulled along the bottom of the ore block to form the first cutting roadway; at the end of the first cutting roadway, the first cutting roadway perpendicular to the first cutting roadway is excavated. Second cutting drift; excavate the cutting patio upwards in the second cutting drift;
[0033] grooving the first cutting lane to form a first free surface;
[0034] The second cutting aisle utilizes the first free surface formed by the first cutting aisle to pull grooves to form a second free surface; the first cutting aisle is perpendicular to the second cutting aisle;
[0035] The first blast hole is arranged on the first free surface, and the second blast hole is arranged on...
Embodiment 2
[0042] In this embodiment, the method for mining the corner ore body in Embodiment 1 is applied to stope 509-1. The underground ore body in the 509-1 stope has a complex state of occurrence, and many branching and compound phenomena. The original mining method is the open-field mining method. The conventional stope arrangement is to construct the ore out of the tunnel in the stage outside the vein to connect with the ore body, pull it away along the bottom of the ore block, and form a cutting roadway 6, as shown in the attached Figure 5 with 6 shown. On both sides of the ore block, pedestrian ventilation patios outside the vein are arranged along the footwall of the ore body. On the pedestrian ventilation patio 7, every 12m is layered, and the pedestrian connection road is excavated to lead vertically to the mine house, and then the layered rock drilling roadway is excavated along the ore body. Cutting shafts are arranged on the upper wall of the ore body in the middle sec...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


